National Repository of Grey Literature 8 records found  Search took 0.01 seconds. 
Construction technological project completion of production hall in Drnovice
Doruška, Jan ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
This master’s thesis contains selected parts of construction-technological project of completion for a manufacturing hall in Drnovice. Based on the documentation used, the focus is aimed mainly at the technological report for the project and its coordination with broader relations of transport routes. Beside these topics, we discuss time and financial plans of the construction, equipment on the construction site, a proposal of main building machinery and mechanisms and the time plan of the main construction project. Furthermore, we provide a technological instructions, control trial plan for installation of a metal construction and façade panels casing, together with a comparison of industrial floors.
Aquaria Production Pavlica
Suchanek, Tomáš ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
This bachelor thesis deals with documentation for gaining building permit approval and documentation for building aquarium factory. Thesis is based on earlier created AG032 course study. Popovice is located in Uherské Hradiště county, this parcel of land is located near south border of the county. The estate is flat and relatively narrow; therefore, the shape of the estate has influenced the placement of individual objects. The estate is near railroad station. Because of the near highway E55, the supply and dispatch accessibility is good. The factory is divided into four above-ground objects that are mutually dilated according to the production requirements. All objects do not possess a cellar. The first object is located in the southern part of the estate. In the first object there is a product showroom and administrative section with employee facilities. Due to showroom’s atypical shape, this object is partially made of reinforced concrete and partially made of Porotherm system construction blocks. The production hall is located behind this object. The access to the production hall is possible with a truck, also it is possible to manipulate heavy blocks of glass with a crane. The manufacturing process of glueing has high demands for light, therefore, the object is equipped with roof belt light well and large glass walls. This production hall is connected to waste storage unit in the east side and wood processing building on the north side. Also, there are technological facilities for both objects. The supply and dispatch area is located between the main production hall, waste storage unit and wood processing building. The construction system of production objects is skeleton, prefabricated and based on monolithic nibs. The light wells and roof are made of steel. Waste storage unit’s load-bearing system is made of bricks. Kingspan white colour facade panels are the main connecting elements throughout the whole factory. Behind the factory there is park greenery with
Production buildings, Production of aquariums in Brno
Drápela, Jan ; Maar, Radek (referee) ; Boleslavská, Yvona (advisor) ; Bečkovský, David (advisor)
This bachelor thesis aims to design a new building for manufacturing aquariums with part for administration and public part in Horní Heršpice. This project is based on a study made on a subject named AG035. Horní Heršpice is Brno city district located in the south part of the city. The building plot is located on the street Sokolova. The building plot has an irregular rectangular shape without major restrictions. The building can be visually divided into two parts – lower one front with public part and administration and higher part with production hall. The front part is partially sunk below ground level which brings it closer to passing visitors and offers views from the aquarium. Compared to other buildings it is clad with yellow corrugated facade panels. The entrance hall opens to visitors and provides separate entrances to the exhibition space in one part and administrative space in the other part. The second building is significantly higher clad in bright color panels. From one side there is an embedded lower part with support areas with yellow cladding. The buildings gradually rise. Both buildings are connected with a glazed corridor. One of the primary tasks of the design is to create a well-organized and collision-free space. The building is divided into two different hight levels and has no cellar. A structural system of administrative part is a cast-in-place concrete structure, the production hall with support areas is from precast concrete frame.
ACQUISITION PRODUCTION BUKOVANY
Salajová, Barbara ; Myslín,, Jiří (referee) ; Dýr, Petr (advisor) ; Kolář, Radim (advisor)
The bachelor thesis deals with documentation for obtaining a building permit and documentation of construction of aquarium production. The proposed building is located in the village Bukovany in the district Hodonin. The plot is in the eastern part of the village. Land is slightly sloping. There is no built-up area, only a municipal cemetery and a football field. The building is divided into two main parts, which are interconnected by staircase space. The first part is two-storey The first floor is located showroom and facilities for employees. On the second floor there are offices for administrative workers. This part is made of brick Porotherm and flat roof. The area around this part is decorated with greenery and there is also parking for visitors and employees. The second part is a one-storey aquarium production hall, partly embedded in the ground. There is also a waste storage area and a carpentry area in the lobby. There is also a technological background of both buildings. The construction system of the production hall is prefabricated, based on monolithic feet. Kingspan façade panels are the connecting elements for the entire plant. The roof of the hall is gabled with a slight slope of 3%. The space behind the hall serves as an access point for trucks.
Production buildings, Production of aquariums in Brno
Drápela, Jan ; Maar, Radek (referee) ; Boleslavská, Yvona (advisor) ; Bečkovský, David (advisor)
This bachelor thesis aims to design a new building for manufacturing aquariums with part for administration and public part in Horní Heršpice. This project is based on a study made on a subject named AG035. Horní Heršpice is Brno city district located in the south part of the city. The building plot is located on the street Sokolova. The building plot has an irregular rectangular shape without major restrictions. The building can be visually divided into two parts – lower one front with public part and administration and higher part with production hall. The front part is partially sunk below ground level which brings it closer to passing visitors and offers views from the aquarium. Compared to other buildings it is clad with yellow corrugated facade panels. The entrance hall opens to visitors and provides separate entrances to the exhibition space in one part and administrative space in the other part. The second building is significantly higher clad in bright color panels. From one side there is an embedded lower part with support areas with yellow cladding. The buildings gradually rise. Both buildings are connected with a glazed corridor. One of the primary tasks of the design is to create a well-organized and collision-free space. The building is divided into two different hight levels and has no cellar. A structural system of administrative part is a cast-in-place concrete structure, the production hall with support areas is from precast concrete frame.
ACQUISITION PRODUCTION BUKOVANY
Salajová, Barbara ; Myslín,, Jiří (referee) ; Dýr, Petr (advisor) ; Kolář, Radim (advisor)
The bachelor thesis deals with documentation for obtaining a building permit and documentation of construction of aquarium production. The proposed building is located in the village Bukovany in the district Hodonin. The plot is in the eastern part of the village. Land is slightly sloping. There is no built-up area, only a municipal cemetery and a football field. The building is divided into two main parts, which are interconnected by staircase space. The first part is two-storey The first floor is located showroom and facilities for employees. On the second floor there are offices for administrative workers. This part is made of brick Porotherm and flat roof. The area around this part is decorated with greenery and there is also parking for visitors and employees. The second part is a one-storey aquarium production hall, partly embedded in the ground. There is also a waste storage area and a carpentry area in the lobby. There is also a technological background of both buildings. The construction system of the production hall is prefabricated, based on monolithic feet. Kingspan façade panels are the connecting elements for the entire plant. The roof of the hall is gabled with a slight slope of 3%. The space behind the hall serves as an access point for trucks.
Aquaria Production Pavlica
Suchanek, Tomáš ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
This bachelor thesis deals with documentation for gaining building permit approval and documentation for building aquarium factory. Thesis is based on earlier created AG032 course study. Popovice is located in Uherské Hradiště county, this parcel of land is located near south border of the county. The estate is flat and relatively narrow; therefore, the shape of the estate has influenced the placement of individual objects. The estate is near railroad station. Because of the near highway E55, the supply and dispatch accessibility is good. The factory is divided into four above-ground objects that are mutually dilated according to the production requirements. All objects do not possess a cellar. The first object is located in the southern part of the estate. In the first object there is a product showroom and administrative section with employee facilities. Due to showroom’s atypical shape, this object is partially made of reinforced concrete and partially made of Porotherm system construction blocks. The production hall is located behind this object. The access to the production hall is possible with a truck, also it is possible to manipulate heavy blocks of glass with a crane. The manufacturing process of glueing has high demands for light, therefore, the object is equipped with roof belt light well and large glass walls. This production hall is connected to waste storage unit in the east side and wood processing building on the north side. Also, there are technological facilities for both objects. The supply and dispatch area is located between the main production hall, waste storage unit and wood processing building. The construction system of production objects is skeleton, prefabricated and based on monolithic nibs. The light wells and roof are made of steel. Waste storage unit’s load-bearing system is made of bricks. Kingspan white colour facade panels are the main connecting elements throughout the whole factory. Behind the factory there is park greenery with
Construction technological project completion of production hall in Drnovice
Doruška, Jan ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
This master’s thesis contains selected parts of construction-technological project of completion for a manufacturing hall in Drnovice. Based on the documentation used, the focus is aimed mainly at the technological report for the project and its coordination with broader relations of transport routes. Beside these topics, we discuss time and financial plans of the construction, equipment on the construction site, a proposal of main building machinery and mechanisms and the time plan of the main construction project. Furthermore, we provide a technological instructions, control trial plan for installation of a metal construction and façade panels casing, together with a comparison of industrial floors.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.