|
Design of underground garage in Brno
Hájek, Jan ; Hladík, Pavel (referee) ; Zich, Miloš (advisor)
The goal of the project is behaviour and dimensioning of selected monolithic concrete structure elements. Design and assessment of the building foundation was made. Slabs of the floors are dimensioned in detail. All computations are made in accordance with Eurocode 2. Drawing documentation is part of this project.
|
|
Mounting frame structures of production and warehouse complex in Paskov
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the submitted thesis is the implementation of a reinforced concrete skeleton assembled in Paskov. This is a manufacturing and warehouse facility Italinox. The work contains a comprehensive technical report, technical report transport relations, bills of quantities, two technological regulations, two control and test plans, design of mechanical assemblies, and health and safety. The appendix contains drawings framed construction and piloting, budget, schedule, drawing of the site.
|
|
Design of underground garage in Brno
Hájek, Jan ; Hladík, Pavel (referee) ; Zich, Miloš (advisor)
The goal of the project is behaviour and dimensioning of selected monolithic concrete structure elements. Design and assessment of the building foundation was made. Slabs of the floors are dimensioned in detail. All computations are made in accordance with Eurocode 2. Drawing documentation is part of this project.
|
|
Mounting frame structures of production and warehouse complex in Paskov
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the submitted thesis is the implementation of a reinforced concrete skeleton assembled in Paskov. This is a manufacturing and warehouse facility Italinox. The work contains a comprehensive technical report, technical report transport relations, bills of quantities, two technological regulations, two control and test plans, design of mechanical assemblies, and health and safety. The appendix contains drawings framed construction and piloting, budget, schedule, drawing of the site.
|