National Repository of Grey Literature 24 records found  previous5 - 14next  jump to record: Search took 0.01 seconds. 
Preparation for realization of reinforced concrete storage hall in Polička
Zelinková, Marta ; Kratochvílová, Erika (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
Extension of storage hall in Jirice - gross superstructure
Jůzl, Martin ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of the thesis is structural and technological solutions gross superstructure Object Extension to production and storage hall in Jiřice. The solution is dependent on the choice of the technological process of installation of steel structures, which will be addressed from a financial and timing perspective. Workflow will be affected by mechanical assembly, wider transport links and facilities construction site.
PFM Flexi storage hall - construction technology project
Chroustovský, David ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
ZOO garden Brno, Refreshment structure - rough construction
Černohorská, Magda ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
aim of this bachelor thesis is the building-technological solutions of Zoo garden Brno, refreshment structure – rough construction. Part of the thesis is technical report the work site facilities, transport links, reports the machine design, schedule and budget, technical report the work site facilities, problem details, monitoring and test plans, protection of healt and environmental.
Construction of a sports hall in Nové Město na Moravě - construction technology project
Tomášek, Martin ; Valenta, Michal (referee) ; Biely, Boris (advisor)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
Apartment building Bílá hora - gross substructure
Michalčíková, Lucie ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The aim of this bachelor thesis is the building-technological solutions of gross substructure to apartment building Bílá hora. Part of the thesis is technical report the work site facilities, technical regulation of selected works, monitoring and test plans, reports the machine design with associated transport links, plan of safety and protection of health, environmental, budget and schedule.
Industrial comlex AQUASYS - construction and technological project
Juračka, Lukáš ; Trojan, Roman (referee) ; Biely, Boris (advisor)
This Master’s thesis deals with the technological project of building an industrial complex AQUASYS in Žďár nad Sázavou. This work includes technical reports ZS and STP, site equipment, wider transport relations, budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work and job security for this building.
Construction of production hall, implementation (nebo execution) of superstructure.
Kroutil, Karel ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The aim of the bachelor thesis is the construction and technological solution of the rough top structure of the assembly and production hall in Litomyšl. Specifies the technological rules for the installation of the steel structural structure and the mounting of the wall panels. The work includes broader transport links, site construction equipment, time schedules, machine assemblies, control and test plan, work safety and item budget.
Construction of a sports hall in Nové Město na Moravě - construction technology project
Tomášek, Martin ; Valenta, Michal (referee) ; Biely, Boris (advisor)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
Preparation for realization of reinforced concrete storage hall in Polička
Zelinková, Marta ; Kratochvílová, Erika (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.

National Repository of Grey Literature : 24 records found   previous5 - 14next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.