National Repository of Grey Literature 25 records found  beginprevious21 - 25  jump to record: Search took 0.00 seconds. 
Bridge over the Jihlava river
Hibš, Daniel ; Klusáček, Ladislav (referee) ; Panáček, Josef (advisor)
This bachelor thesis deals with the design of a new bridge construction over the Jihlava river in Luka nad Jihlavou. The bridge is located on the road III/4044 at stationing 0,033 km. The bridge evidence number is 4044-1. Three studies were worked out in this thesis. First variant of load-bearing structure projects prestressed beams with composite slab, the next variant suggests dual girder construction and the third variant is prestressed concrete slab. The first study was selected – the bridge made of post-tensioned prefabricated beams with composited reinforced concrete slab. The calculation was carried out in the SCIA Engineer program, and selected outputs were checked by manual calculation. In addition, the time dependent analysis with construction phases was performed.
Highway viaduct
Zatloukal, Bohuslav ; Šopík,, Leonard (referee) ; Stráský, Jiří (advisor)
The subject of this thesis is the design and assessment of the bridge across the expressway and the deep valley in section Hričovské Podhradie - Lietavská Lúčka of highway D1 in Slovakia. The box girder structure with eleven spans was chosen of three variants. For each course there is a separate structure. The design of the bridge is carried out according to limit states including consideration of the impact of construction. The assessment of the construction is carried out using the beam model. The appendix contains structural analysis, drawings and visualization of the bridge.
Design of highway bridge
Luberová, Lucie ; Formánek, Ing Martin (referee) ; Zich, Miloš (advisor)
The subject of this bachelo r’s thesis is the design a new supporting bridge construction in Prešovský kraj, district Levoča the territory of Slovak Republic. This object is located on the highway D 26,5/120, at kilometer 13,499 795 and communication of third class – 131-00 bridges. The objective is the design of a perpendicular four-span construction, which is proposed in three variants. The first variant is a chamber girder with inclined walls from post-tensioned concrete height 2,480 m. The second variant is composed of two beamed cross-section and the third variant is composed of one beamed cross-section. For detailed assessment the first variant was chosen with a length of bridging of 166,000 m. The calculation of load effects is done by software Scia Engineer and compared with a manual calculation according to current standards. This bridge is designed according to limit states, construction´s influence on design is taking into consideration. Structural analysis, well arranged drawings and visualization are elaborated in this thesis too.
Prestressed bridge No. 202 on the expressway R2 in Slovakia
Janek, Tomáš ; Urban, Jiří (referee) ; Koláček, Jan (advisor)
My diploma thesis deals with design of the bridge number 202 on expressway in Slovakia. The bridge leads across the road number I50 (between Trenčín and Bánovce nad Bebravou) and railway number 130 (between Trenčín and Chynorany). For each course there is a separate super-structure. Only left super-structure is considered for the work. The box girder with four spans is chosen from three variations. This bridge is designed according to limit states, construction´s influence on design is taking into consideration. Structural model of construction is made as a spatial bar model. Structural analysis, well arranged drawings and visualization are elaborated in this thesis too.
Bridge over the Živný Brook
Sekanina, Josef ; Řehulka, Martin (referee) ; Panáček, Josef (advisor)
This thesis occupies with the design of the road bridge over the stream Živný, a railway lane and a projected road between Běleč village and Husinec village. There are designed three variants of bridges. The variant no. 1 – continuous box girded beam – was chosen for the detailed analysis. The pre-stressed concrete road bridge is designed and evaluated according to European standards – Euro codes. The sequential construction influence and its impact on the construction is also considered in the calculations. The drawing documentation and the visualization of the bridge are made.

National Repository of Grey Literature : 25 records found   beginprevious21 - 25  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.