National Repository of Grey Literature 3 records found  Search took 0.00 seconds. 
Koks production hall - upper stage of construction
Vaculík, Zdeněk ; Průcha, Aleš (referee) ; Biely, Boris (advisor)
Subject of this work is execution of the superstructure, especially solution of mounted frame included the lining together with the sheathing construction and building roof. The building will serve as assembly and storage hall for the Koks Production company. Reinforced concrete precast frame forms supporting structure. The building is split to two parts, single-storey hall and two-storey administration part. Construction-technological part from complete execution of the building rough superstructure has been selected as a bachelor’s thesis subject. The technological regulation for the assembly of reinforced concrete precast frame has been elaborated. The precast frame is formed by precast elements supplemented by the lining between the columns in the administration part. The solution of following subjects of building construction was taken into consideration too: • solution of suitable site machinery • workers health, safety, and preservation on the site • health protection • test and trial plan for the mounted reinforced concrete skeleton • time schedule and economic analysis for the superstructure • logistics and material storage on the site
Production and administrative building in the village Drásov - construction technology project
Vaculík, Zdeněk ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of my master's thesis is the realization of a prefabricated hall with an administrative annex in the village of Drásov. The production hall will serve as a winding and dispatch of production. The hall also includes a masonry annex, which will serve for administrative purposes and as social and hygienic facilities for employees. This thesis contains a technical report on the construction and technological project, a study of the implementation of the main technological stages of the SO 01 building and the solution of wider transport relations, including the drawing of traction curves for critical construction traffic. This work further examines the construction site equipment project, which is processed in four construction variants, including the overall location of the construction site in the area. A financial and time plan has been developed for the entire construction for all construction objects. The realization of the prefabricated hall was drawn in three drawing schemes, including material assurance of the prefabricates delivery. A detailed time plan and item budget was developed for the object. Within the work, a technological regulation was developed for the deep and surface foundations of the main object and also for the realization of the J01 pit. A control and testing plan, which was prepared for the realization of the deep foundation of the SO 01 object, follows the part of the technological specification. A safety and health protection plan, including possible risks, was also prepared for the foundation of the object. Last but not least, the phase of environmental protection during the construction works was also included. A noise study was prepared to examine the impact of construction noise on the surrounding buildings.
Koks production hall - upper stage of construction
Vaculík, Zdeněk ; Průcha, Aleš (referee) ; Biely, Boris (advisor)
Subject of this work is execution of the superstructure, especially solution of mounted frame included the lining together with the sheathing construction and building roof. The building will serve as assembly and storage hall for the Koks Production company. Reinforced concrete precast frame forms supporting structure. The building is split to two parts, single-storey hall and two-storey administration part. Construction-technological part from complete execution of the building rough superstructure has been selected as a bachelor’s thesis subject. The technological regulation for the assembly of reinforced concrete precast frame has been elaborated. The precast frame is formed by precast elements supplemented by the lining between the columns in the administration part. The solution of following subjects of building construction was taken into consideration too: • solution of suitable site machinery • workers health, safety, and preservation on the site • health protection • test and trial plan for the mounted reinforced concrete skeleton • time schedule and economic analysis for the superstructure • logistics and material storage on the site

Interested in being notified about new results for this query?
Subscribe to the RSS feed.