National Repository of Grey Literature 28 records found  beginprevious19 - 28  jump to record: Search took 0.01 seconds. 
Analysis and risk assessment of implementation of energy saving via renovation of school facilities
Šafářová, Tereza ; Bednářová, Bronislava (referee) ; Vymazal, Tomáš (advisor)
The thesis is focused on analysis and risk assessment during the reconstruction of the school building. The work will be used appropriate methods to a specific reconstruction of school, especially checklist and risk catalog. They will be determined by the ris ks that caused the failure to comply with the schedule of works and thus limit the operation of school and the surrounding area. These risks will be set out measures that should determine how these scenarios could have been avoided.
Revision of an integrated management system with regard to the risk management methods
Šubrtová, Michaela ; Bednářová, Bronislava (referee) ; Vymazal, Tomáš (advisor)
The subject of my thesis is to undertake a comprehensive analysis of the current status of the company. In the thesis the economic and risk analysis. For economic analysis is used SWOT analysis, Porter's five forces and PEST analysis. From risk analysis, I selected a fault tree analysis FTA and trouble-free assessment of human activities HRA. FTA is used to identify the possible causes of risk and calculate the probability that an unfavorable risk occurs. HRA analysis is used to evaluate the effects of human error on the system. Based on these analyzes identified shortcomings and to suggest effective improvements for the company.
Analysis and risk assessment of selected technologies of construction of structures
Šifrová, Sláva ; Bednářová, Bronislava (referee) ; Vymazal, Tomáš (advisor)
The thesis is focused on the identification, analysis and assessment of risks in three key areas (quality, environment, occupational safety and health). The paper made a risk analysis according to ISO 31000: 2010 Risk Management - Principles and guidelines. The risk assessment of selected construction technologies were chosen following methods - analysis methods and consequences of failures (FMEA), Pareto diagram, analysis of the causes and consequences (Ishikawa) and analysis of the type of butterfly. Using these methods are evaluated selected risks to propose action to reduce its value and impact. The aim of this thesis is to identify, assess and analyze the risks and handle simple tools for the management and elimination.
Risk analysis and management of technological stages of construction
Sáček, Petr ; Bednářová, Bronislava (referee) ; Vymazal, Tomáš (advisor)
This thesis deals with the analysis and evaluation of quality, environmental, and security risks, hazards and application of appropriate methodology to a particular construction project. For an application is selected the key construction technology - walling. Diploma thesis establishes a framework for risk management on the basis of established integrated management system (IMS) defines the objectives and mechanisms in controlling adherence to standards, evaluation of business risks, defining risk management strategies, the draft risk management procedures, monitoring their functioning, assessing their performance and any improvement and support the process of supplying the required information.
Risk analysis and evaluation in building foundations design
Kalenda, Lukáš ; Bednářová, Bronislava (referee) ; Vymazal, Tomáš (advisor)
This diploma thesis deals with the analysis and evaluation of quality, environmental and safety risks in the design process of the designing the foundations of building. The calculation procedure is shown in the model example. Subsequently, the risk analysis according to DIN EN 31010: 2011 Risk Management - Risk Assessment Techniques is performed. The risk assessment was made by following methods: analysis of the causes and consequences (Ishikawa diagram), the risk matrix and Analysis Failure Modes and Effects (FMEA). Using these methods, the risk were identified and assessed. There are also proposed appropriate measures to reduce the risk value. Comparisons with publications with a similar theme is performed in the final summary.
Effectiveness evaluation of occupational safety and health management in civil engineering in the Czech Republic
Kratina, Zdeněk ; Bednářová, Bronislava (referee) ; Vymazal, Tomáš (advisor)
Thesis deals with the development of risk management in the construction industry in Czech republic in time of the economic crisis since 2007. There is in detail described the present and paste state of the construction industry in this thesis, thanks to construction output index, the volume of construction output, etc. There is overview of accidents and deaths in costuction industry, history of risk management in the construction industry and the main reasones of injuries and deaths in the construction industry described in this thesis. The aim of this thesis is to inform about development and efectiveness of risk management and evaluate work injuries in construction industry with the assumption further development.
Risk analysis and evaluation of using automated systems in building construction design
Koza, Josef ; Bednářová, Bronislava (referee) ; Vymazal, Tomáš (advisor)
This thesis in its first part deals with the complexity of the legislation, which is related to design activities and also trying to explain the basic rules for the creation of project documentation. In the main section then analyzes and evaluates the selected drawing software in defined categories. Based on the selection chooses the best drawing software and compared with the hand-crafted version of the design documentation in terms of time and cost. The final time for the creation of project documentation will be converted to a built-up area of the building and found the relationship between time constraints and the size of the built-up area of the new building. It will also be evaluating the return on investment to drawing software and assessing cost-effectiveness of various options drawing. The aim of this thesis is to analyze the risks in the use of software products for structural design and evaluate their use based on the value of work.
Risk analysis and evaluation of sources of public water supply
Novotná, Aneta ; Bednářová, Bronislava (referee) ; Vymazal, Tomáš (advisor)
The thesis is focused on the identification, quantification and assessment of risks in the supply of drinking water, the application of appropriate methods for specific public water supply, the environment and operation. WaterRisk method based on EN 31010 Risk Management - Techniques of risk assessment methods are chosen - analysis of possible defects and their consequences (FMEA), Pareto diagram and Ishikawa diagram. The aim of the thesis is analyze and assess the quality, environmental and safety risks to the public water supply system and use tools for their management and elimination. The results will be compared and evaluated the advantages and disadvantages of each analysis.
Analysis and Evaluation of the Risk Involved in Techniques Used in the Construction of Built Structures in a Integrated Control System Environment
Bednářová, Bronislava ; Misák, Petr (referee) ; Vymazal, Tomáš (advisor)
This thesis focuses on the analysis and evaluation of quality, environmental and safety risks and applying appropriate methodologies. From ČSN EN 31010 Risk management - Risk assessment techniques were selected for work tools - Failure Modes and Effects Analysis (FMEA), Pareto diagram, Bow tie analysis and Causes and effect analysis (Ishikawa diagram). The aim of this thesis is to analyze and assess the quality, environmental and safety risks of selected construction technologies and conditions established an integrated management system to handle simple tools for the management and elimination.
Exhibition Gallery
Bednářová, Bronislava ; Barnat, Jan (referee) ; Bajer, Miroslav (advisor)
This master´s thesis is deal with design of steel structure of exhibition gallery. Layout od building is three-arm star, where each arm is rectangular with dimensions 6 x 18 m and arm has two floors. All three arms are connected to the hexagonal prism (space frame), which is on the second floor walkway and covered skylight. Maximum building height is 11.28 meters from the finished grade. The main structure of building is created by twelve frame in cross direction. The roof is flat. The surface of facade is glass created by aluminium structure.

National Repository of Grey Literature : 28 records found   beginprevious19 - 28  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.