National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Implementation of the rough construction of the bowling center Bílá hora
Hladký, Dominik ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The subject of this bachelor thesis is the stage of assembly of a precast reinforced concrete structure with loadbearing structure of a roof of a bowling center Bílá hora. It deals with the working procedure of the assembly of the load-bearing reinforced concrete frame, the load-bearing parts of the roof structure,report of site equipment, time schedule, used building equipment, inspection and testing schedule, occupational safety and line-item budget. The thesis also includes a comparison of clay block cladding with mineral wool contact thermal insulation and Kingspan insulated panel system. In attachment are contain drawings individually assembly proces, situation, site equipment, assembly drawing panels Kingspan, technology detail
Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
Implementation of the rough construction of the bowling center Bílá hora
Hladký, Dominik ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The subject of this bachelor thesis is the stage of assembly of a precast reinforced concrete structure with loadbearing structure of a roof of a bowling center Bílá hora. It deals with the working procedure of the assembly of the load-bearing reinforced concrete frame, the load-bearing parts of the roof structure,report of site equipment, time schedule, used building equipment, inspection and testing schedule, occupational safety and line-item budget. The thesis also includes a comparison of clay block cladding with mineral wool contact thermal insulation and Kingspan insulated panel system. In attachment are contain drawings individually assembly proces, situation, site equipment, assembly drawing panels Kingspan, technology detail

See also: similar author names
5 Hladký, David
1 Hladký, Dmitrij
Interested in being notified about new results for this query?
Subscribe to the RSS feed.