National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Bridge over the Jihlava river
Hibš, Daniel ; Klusáček, Ladislav (referee) ; Panáček, Josef (advisor)
This bachelor thesis deals with the design of a new bridge construction over the Jihlava river in Luka nad Jihlavou. The bridge is located on the road III/4044 at stationing 0,033 km. The bridge evidence number is 4044-1. Three studies were worked out in this thesis. First variant of load-bearing structure projects prestressed beams with composite slab, the next variant suggests dual girder construction and the third variant is prestressed concrete slab. The first study was selected – the bridge made of post-tensioned prefabricated beams with composited reinforced concrete slab. The calculation was carried out in the SCIA Engineer program, and selected outputs were checked by manual calculation. In addition, the time dependent analysis with construction phases was performed.
Pedestrian Bridge
Hibš, Daniel ; Kocourek,, Petr (referee) ; Stráský, Jiří (advisor)
This diploma thesis deals with the design of a new bridge construction over a multi-lane communication. The converted road is a pedestrian and biking trail connecting significant agglomerations. Three studies were worked out in this thesis and the C variant was selected for further detailed processing. It is an unsymmetrical suspended bridge with a cast-in-place deck. In the section above the communication, the bridge is made up of prefabricated segments. Suspension of the structure is made of two sloping pylons forming a V-shape. The analysis of the construction was carried out in the MIDAS Civil program, where a complete model of construction was entered, including a subsequent estacade. The model describes the construction process and includes creep and shrinkage of the concrete. The traffic, temperature and wind loads were used. The design was assessed for the ultimate limit states and serviceability limit states. The assessment was carried out in the IDEA StatiCa program, supplemented by manual calculations. The static calculations also include assessment of the harmonic response. Subsequently, overview drawings, detailed drawings and visualizations were developed.
Pedestrian Bridge
Hibš, Daniel ; Kocourek,, Petr (referee) ; Stráský, Jiří (advisor)
This diploma thesis deals with the design of a new bridge construction over a multi-lane communication. The converted road is a pedestrian and biking trail connecting significant agglomerations. Three studies were worked out in this thesis and the C variant was selected for further detailed processing. It is an unsymmetrical suspended bridge with a cast-in-place deck. In the section above the communication, the bridge is made up of prefabricated segments. Suspension of the structure is made of two sloping pylons forming a V-shape. The analysis of the construction was carried out in the MIDAS Civil program, where a complete model of construction was entered, including a subsequent estacade. The model describes the construction process and includes creep and shrinkage of the concrete. The traffic, temperature and wind loads were used. The design was assessed for the ultimate limit states and serviceability limit states. The assessment was carried out in the IDEA StatiCa program, supplemented by manual calculations. The static calculations also include assessment of the harmonic response. Subsequently, overview drawings, detailed drawings and visualizations were developed.
Bridge over the Jihlava river
Hibš, Daniel ; Klusáček, Ladislav (referee) ; Panáček, Josef (advisor)
This bachelor thesis deals with the design of a new bridge construction over the Jihlava river in Luka nad Jihlavou. The bridge is located on the road III/4044 at stationing 0,033 km. The bridge evidence number is 4044-1. Three studies were worked out in this thesis. First variant of load-bearing structure projects prestressed beams with composite slab, the next variant suggests dual girder construction and the third variant is prestressed concrete slab. The first study was selected – the bridge made of post-tensioned prefabricated beams with composited reinforced concrete slab. The calculation was carried out in the SCIA Engineer program, and selected outputs were checked by manual calculation. In addition, the time dependent analysis with construction phases was performed.

See also: similar author names
3 Hibš, Dominik
Interested in being notified about new results for this query?
Subscribe to the RSS feed.