National Repository of Grey Literature 3 records found  Search took 0.01 seconds. 
Design o the prestressed bridge structure
Schafferová, Denisa ; Pinkas, Karel (referee) ; Klusáček, Ladislav (advisor)
The aim of the master thesis is to elaborate a detailed design of the bridge structure. The structure is designed as a single-frame bridge with 2 spans with a total length of 55,7 m. The calculation of load effects is performed in Scia Engineer 22.0. The structure is examined for service limit state and ultimate limit state according to the valid European standards. MS Excel, IDEA StatiCa 23.0 and Beton FIN EC 2020 are used for the design of the cross-sections. The thesis contains detailed drawings of the designed parts.
D1 Reconstruction of Bridge on Motorway D1-212 in Ostrovačice, Preparation and Realization of Structure
Kratochvíl, Tomáš ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The diploma thesis deals with preparation and realization of D1 reconstruction of D1-212 bridge in Ostrovačice. It is a motorway bridge that transfers traffic over road II / 386. The reconstruction will demolish the superstructure of bridge with bridge equipment and parts of the abutments and their new construction. The preparation of the project solves the engineering report, the block plan drawing, the financial and time schedule - by objects, the budget SO 201, the study of the implementation of the main construction technologys, the project of the site equipment, the design of the main building machines, the SO 201 time schedule, a desigh of the bill of quantities for structure, technical note for superstructure of a bridge and control and test plans. Part of the preparation of the building is the processing of the emergency plan.
D1 Reconstruction of Bridge on Motorway D1-212 in Ostrovačice, Preparation and Realization of Structure
Kratochvíl, Tomáš ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The diploma thesis deals with preparation and realization of D1 reconstruction of D1-212 bridge in Ostrovačice. It is a motorway bridge that transfers traffic over road II / 386. The reconstruction will demolish the superstructure of bridge with bridge equipment and parts of the abutments and their new construction. The preparation of the project solves the engineering report, the block plan drawing, the financial and time schedule - by objects, the budget SO 201, the study of the implementation of the main construction technologys, the project of the site equipment, the design of the main building machines, the SO 201 time schedule, a desigh of the bill of quantities for structure, technical note for superstructure of a bridge and control and test plans. Part of the preparation of the building is the processing of the emergency plan.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.