National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
The Fire Station Holešov
Křepelka, Jakub ; Struhala, Karel (referee) ; Manychová, Monika (advisor)
The Master’s thesis is about processing design documentation for a new bulding of firehouse type P4. Location of the bulding is chosen so the firehouse is near the industrial precinct , further to be near to the planned highway connection and city bypass so they don’t have to pass in the event of an alarm through the city. The firehouse is design as partly two-storey and partly single-storey building. On the first floor is on the north storage part with technical utility rooms. In the middle is garage for fire trucks, and on the south side of the station is hygienic and wet areas, gym and meeting room for emergency staff. On the second floor are rooms for firefighters and offices for officers. Construction system of the building is precast concrete frame with longitudinal construction system. Building envelope is due to the local architecture designed as infill wall with contact thermal insulation systém ETICS. Warm flat roof are green. In the station are placed eight firetrucks (3x CAS, DA, TZA, RZA, AŽ, NA) and 17 fireman in the one shift in three teams.
Sanitation installations in the building of forestry
Křepelka, Jakub ; Sýkorová, Iva (referee) ; Vrána, Jakub (advisor)
The bachelor thesis is focused on sanitary equipment in building of military forestry. The theoretical part of the thesis deals with the stormwater soakaways. The computational and project part concerns distribution of sewer and water in the building.
The Fire Station Holešov
Křepelka, Jakub ; Struhala, Karel (referee) ; Manychová, Monika (advisor)
The Master’s thesis is about processing design documentation for a new bulding of firehouse type P4. Location of the bulding is chosen so the firehouse is near the industrial precinct , further to be near to the planned highway connection and city bypass so they don’t have to pass in the event of an alarm through the city. The firehouse is design as partly two-storey and partly single-storey building. On the first floor is on the north storage part with technical utility rooms. In the middle is garage for fire trucks, and on the south side of the station is hygienic and wet areas, gym and meeting room for emergency staff. On the second floor are rooms for firefighters and offices for officers. Construction system of the building is precast concrete frame with longitudinal construction system. Building envelope is due to the local architecture designed as infill wall with contact thermal insulation systém ETICS. Warm flat roof are green. In the station are placed eight firetrucks (3x CAS, DA, TZA, RZA, AŽ, NA) and 17 fireman in the one shift in three teams.
Sanitation installations in the building of forestry
Křepelka, Jakub ; Sýkorová, Iva (referee) ; Vrána, Jakub (advisor)
The bachelor thesis is focused on sanitary equipment in building of military forestry. The theoretical part of the thesis deals with the stormwater soakaways. The computational and project part concerns distribution of sewer and water in the building.

See also: similar author names
8 Křepelka, Jan
4 Křepelka, Jonáš
Interested in being notified about new results for this query?
Subscribe to the RSS feed.