National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Comparison of Plain Line Tamping Methods
Bombera, Jan ; Hartmann, Miroslav (referee) ; Svoboda, Richard (advisor)
The diploma´s thesis deals with evaluation of adjusted track tamping technology and its comparison with currently used technology. This is based on track geometry parameters measuring and its vertical movement on the test section, which was created on double track Břeclav – Přerov near Rohatec station. On this test section one line was tamped with the currently used method within regular maintenance work and the second line was tamped with the adjusted technology. The technology modification is based on application of increased number of tamping tines squeezing strokes, which results in a creation of bigger and more compacted sleeper bed. The point of this thesis is to verify, that the speed of the track geometry parameters degradation is smaller in case of adjusted technology use. Thanks to that it would be possible to extend the maintenance cycles in case of compliance with track parameters maintenance limits and traffic safety.
Comparison of Plain Line Tamping Methods
Bombera, Jan ; Hartmann, Miroslav (referee) ; Svoboda, Richard (advisor)
The diploma´s thesis deals with evaluation of adjusted track tamping technology and its comparison with currently used technology. This is based on track geometry parameters measuring and its vertical movement on the test section, which was created on double track Břeclav – Přerov near Rohatec station. On this test section one line was tamped with the currently used method within regular maintenance work and the second line was tamped with the adjusted technology. The technology modification is based on application of increased number of tamping tines squeezing strokes, which results in a creation of bigger and more compacted sleeper bed. The point of this thesis is to verify, that the speed of the track geometry parameters degradation is smaller in case of adjusted technology use. Thanks to that it would be possible to extend the maintenance cycles in case of compliance with track parameters maintenance limits and traffic safety.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.