National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Fire Station Type C2
Wojcik, Jindřich ; Dohnal, Jakub (referee) ; Fuciman, Ondřej (advisor)
Diplom thesis is about design of the fire station of type C2 for the HZS. The building is divided into two parts. First part of a building is designed as a rectangular recessed floor. The first part of building consists of two floors and one underground floor. Roofed by a single-layer flat roof of soft PVC. The building will be used to perform the services, the fire brigade. It will be used 24 hours a day. In the basement is located warehouse, HVAC room, utility room and a lounge with an alternative source of electricity. On the first floor are designed garages for storage technique and also the dressing room, workroom, washing box, warehouse, room for chemical-technical service and concierge. The second floor is designed to serve firefighters. The second part of the building is a training tower, which will be used to train firefighters and for drying hoses. The training tower is designed as a simple steel structure with four floors. The project was developed in the educational version of ArchiCAD 16th project is designed in accordance with the requirements of a layout, architectural design, structural design proper and safe use of the building.
Fire Station Type C2
Wojcik, Jindřich ; Dohnal, Jakub (referee) ; Fuciman, Ondřej (advisor)
Diplom thesis is about design of the fire station of type C2 for the HZS. The building is divided into two parts. First part of a building is designed as a rectangular recessed floor. The first part of building consists of two floors and one underground floor. Roofed by a single-layer flat roof of soft PVC. The building will be used to perform the services, the fire brigade. It will be used 24 hours a day. In the basement is located warehouse, HVAC room, utility room and a lounge with an alternative source of electricity. On the first floor are designed garages for storage technique and also the dressing room, workroom, washing box, warehouse, room for chemical-technical service and concierge. The second floor is designed to serve firefighters. The second part of the building is a training tower, which will be used to train firefighters and for drying hoses. The training tower is designed as a simple steel structure with four floors. The project was developed in the educational version of ArchiCAD 16th project is designed in accordance with the requirements of a layout, architectural design, structural design proper and safe use of the building.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.