National Repository of Grey Literature 7 records found  Search took 0.01 seconds. 
Airconditioning of surgeries
Znebejánek, Jiří ; Andrys, Petr (referee) ; Rubina, Aleš (advisor)
The subject of this bachelor thesis is the design of air-handling equipment of surgeries, consisting of three air-conditioning units. The equipment is designed to meet hygienic, operational and functional requirements for indoor cleanroom environments. Air handling equipment provides air exchange, heat loss coverage, heat gain removal, humidification and, in the case of one unit, dehumidification of the air. The theoretical part is focused on ways of regulation in air conditioning.
Airconditioning of intensive care unit
Cakl, Dominik ; Blasinski, Petr (referee) ; Rubina, Aleš (advisor)
This bachelor´s thesis deals with design of air-conditioning and air-condition systems in the spaces of intensive care unit of infection department and employees department. Proposoal of the systems meets relevant standarts, hygiene and operating requirements. The computational part is focused on total object analysis, heat balance, air flow in relation to increased hygiene requirements and requirements for air heating. The computational part also involves distribution, adjustment of air and other proposals, which are integrated in correctly proposed equipment. The theoretical part is involving heat recovery with heat pump. The project is processed on the level of the project implementing.
Intensive care unit air conditioning
Dobrovolná, Natálie ; Uher, Pavel (referee) ; Rubina, Aleš (advisor)
The bachelor's thesis deals with the ventilation system serving hospital premises. The system is divided into two separate functional units. Facility No. 1 serves the ICU (Intensive Care Unit) department and its associated premises. Facility No. 2 serves the facilities of employees, doctors' rooms and associated premises. The design of the equipment meets the relevant standards, hygiene standards and operational requirements. The calculation part deals with the design of air conditioning in the ICU, it deals with the overall analysis of both functional units, heat gains, heat loss, air flows, pressure drops in both functional units and other proposals necessary for the design and proper operation of the air conditioning system. This part is also focused on the distribution and treatment of fresh air. The theoretical part deals with clean rooms, their definition and distribution of air supplied to these rooms. The theoretical part also deals with the installation of operating theaters, images of flow in these areas and their internal microclimate.
Air conditioning of a multifunctional building
Čížek, Vítězslav ; Uher, Pavel (referee) ; Rubina, Aleš (advisor)
This bachelor´s thesis deals with an air conditioning system that serves for warm air heating and ventilation of a multifunctional building. The systém consists of two functional units. The first part will be operated by devices no. 1, 3 a 4, which provide warm air heating and ventilation for the spaces of the playing courts. The second part will be operated by device no. 2, and will serve for warm air ventilation of the facilities for the playing courts. The theoretical part of the thesis focuses on heat recovery systems in air conditioning. In the calculation part, the thesis deals with the design of warm air heating and ventilation, as well as the overal analysis of the both functional units, including the calculation of heat losses, heat gains, air flow rate, and pressure drops. The necessary proposals for the proper functioning of the entire air conditioning system, including the distribution and conditioning of air, are provided.
Intensive care unit air conditioning
Dobrovolná, Natálie ; Uher, Pavel (referee) ; Rubina, Aleš (advisor)
The bachelor's thesis deals with the ventilation system serving hospital premises. The system is divided into two separate functional units. Facility No. 1 serves the ICU (Intensive Care Unit) department and its associated premises. Facility No. 2 serves the facilities of employees, doctors' rooms and associated premises. The design of the equipment meets the relevant standards, hygiene standards and operational requirements. The calculation part deals with the design of air conditioning in the ICU, it deals with the overall analysis of both functional units, heat gains, heat loss, air flows, pressure drops in both functional units and other proposals necessary for the design and proper operation of the air conditioning system. This part is also focused on the distribution and treatment of fresh air. The theoretical part deals with clean rooms, their definition and distribution of air supplied to these rooms. The theoretical part also deals with the installation of operating theaters, images of flow in these areas and their internal microclimate.
Airconditioning of surgeries
Znebejánek, Jiří ; Andrys, Petr (referee) ; Rubina, Aleš (advisor)
The subject of this bachelor thesis is the design of air-handling equipment of surgeries, consisting of three air-conditioning units. The equipment is designed to meet hygienic, operational and functional requirements for indoor cleanroom environments. Air handling equipment provides air exchange, heat loss coverage, heat gain removal, humidification and, in the case of one unit, dehumidification of the air. The theoretical part is focused on ways of regulation in air conditioning.
Airconditioning of intensive care unit
Cakl, Dominik ; Blasinski, Petr (referee) ; Rubina, Aleš (advisor)
This bachelor´s thesis deals with design of air-conditioning and air-condition systems in the spaces of intensive care unit of infection department and employees department. Proposoal of the systems meets relevant standarts, hygiene and operating requirements. The computational part is focused on total object analysis, heat balance, air flow in relation to increased hygiene requirements and requirements for air heating. The computational part also involves distribution, adjustment of air and other proposals, which are integrated in correctly proposed equipment. The theoretical part is involving heat recovery with heat pump. The project is processed on the level of the project implementing.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.