National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Monitoring shifts of the rock block "Hřebenáč" in the Moravian Karst
Lukesová, Dominika ; Kašpar, Karel (referee) ; Šváb, Tomáš (advisor)
The aim of this bachelor thesis is the observation of the shift of the rock formation Hřebenáč in the Moravian Karst. The monitored rock formation is located in front of the Sloup-Sosuvka Caves, in Sloup village. The measurement is done because of the climbers’ and visitors’ security reasons. Firstly, a network of surveying was built and the points on the first rock were placed. The zero phase was measured in August, the first phase in December 2014. The measurements have been done by trigonometric method and levelling method. As a result, the calculation of the levelling method has been done, equalization in VMK program and subsequent transformation in Groma. The evaluation of the shifts has been done on the basis of the comparison of phases.
Deformations Monitoring of Bridge Construction
Fuchs, Martin ; Váša, Petr (referee) ; Soukup, František (advisor)
The aim of my work is to describe the process of monitoring deformations of the bridge construction, applied to the specific case of the bridge: Elevated Prackovice.This work includes general theorems and methods and their use in monitoring of this object.It reflected the influence of geological bedrock. The result of this work is evaluation of the influence of the ongoing construction and landslides to the deformations of the elevated road.
Monitoring shifts of the rock block "Hřebenáč" in the Moravian Karst
Lukesová, Dominika ; Kašpar, Karel (referee) ; Šváb, Tomáš (advisor)
The aim of this bachelor thesis is the observation of the shift of the rock formation Hřebenáč in the Moravian Karst. The monitored rock formation is located in front of the Sloup-Sosuvka Caves, in Sloup village. The measurement is done because of the climbers’ and visitors’ security reasons. Firstly, a network of surveying was built and the points on the first rock were placed. The zero phase was measured in August, the first phase in December 2014. The measurements have been done by trigonometric method and levelling method. As a result, the calculation of the levelling method has been done, equalization in VMK program and subsequent transformation in Groma. The evaluation of the shifts has been done on the basis of the comparison of phases.
Deformations Monitoring of Bridge Construction
Fuchs, Martin ; Váša, Petr (referee) ; Soukup, František (advisor)
The aim of my work is to describe the process of monitoring deformations of the bridge construction, applied to the specific case of the bridge: Elevated Prackovice.This work includes general theorems and methods and their use in monitoring of this object.It reflected the influence of geological bedrock. The result of this work is evaluation of the influence of the ongoing construction and landslides to the deformations of the elevated road.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.