National Repository of Grey Literature 10 records found  Search took 0.01 seconds. 
Conceptual design of the reconstruction of an E.ON 22 kV distribution network installed at a specic area
Vepřek, Tomáš ; Nepevná, Vlastimila (referee) ; Blažek, Vladimír (advisor)
The aim of this thesis is a modification of the distribution network (DS) of the city of Brno to ensure power supply in the required quantity and quality for end consumers. Calculation of steady - state operation of distribution network (DS) of Brno is performed in the programme PAS DAISY Off-Line v.4.00 Bison. On the basis of available data (dispatching scheme, load current of stem lines and reserved power of wholesale customers) we will analyze the steady-state of network. We will find out which of the 110/22 kV transformer stations, cable and overhead lines are overloaded and perform network adjustments to ensure safe and reliable operation by 2015. We will identify in which year we will need to build a new power node in the northern part of Brno. The conclusion is focused on technical and economic evaluation of proposed alternative network arrangements.
Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Slavětice 110 kV switching station, during the period of 2011
Nábělek, Ondřej ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
In the Master Thesis discusses the impact of the bridge connecting the transformer to power system connection to a separate transformers. They were first analyzed the method of calculating the steady operation of the network using the Newton iterative method and the method of calculating short-circuit ratios. It describes the area Slavětice 110kV substation, which is the subject of subsequent calculations. It is also elucidating the function of the bridge connection, advantages and disadvantages. The reason for implementing the bridge operation is to increase the reliability of electricity supply to customers but the major disadvantage is the greater technical and economic performance because increased short circuit current and the need for transmission transformer 400/110kV same type with the same parameters. Point is the practical part, which contains already concrete results taken with the dispatcher software Sinaut. There is a short-circuit resistance compared to short-circuit power substation, then the burden of the elements (transformers, lines) for two specified connection alternatives and four interruptions important elements. Finally, it stated that it can be done with the bridge connection which technical measures. It was discovered that in terms of short-circuit ratios in the present time it is not possible to operate the bridge connection transformers substation Slavětice 110kV and in terms of very different parameters of transformers 400/110kV the operation is not recommended.
Design of the expansion of 22kV distribution network in a specific area
Řehoř, Jiří ; Beneš, Jan (referee) ; Blažek, Vladimír (advisor)
The aim of this work is the reconstruction and development of the distribution network of DS to ensure electricity supply in the required quality to existing customers and new customers connecting to the planned industrial zone Šlapanice. The first part deals with the inclusion of a distribution network in power system, its distribution and composition. Subsequently, the work deals with the description of the management of distribution networks, cable and outdoor leadership and their parameters. It also contains guidelines for the design of high voltage networks. The end of the first part is devoted to calculating the steady operation of the network. In the second part, the proposed project using the PAS DAISY Off-line v 4.00 Bizon. Based on the available evidence is developed steady state operation. We found that lines are overloaded and need to be strengthened with regard to the development of industrial zones and adjusting the network to ensure safe and reliable operation. The conclusion focuses on the economic evaluation of proposed alternatives.
Stabilized operation and short-circuit conditions within E.ON 110kV power network supplied from Otrokovice 110kV switching station, during the period of 2012
Kuba, Petr ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
This thesis deals with steady running and short-circuit conditions in the 110 kV network, E. ON, fed from 110 kV Otrokovice. Substation Otrokovice ensures system transformation from 400 kV to 110 kV system through three transformers. In order to increase reliability of power supply and improved economy is considered to bridge the transition from the operation of two transformers in bridge operations of the three transformers. However, this brings with it significant worsening of short-circuit conditions in the 110 kV network. The task of this work is to evaluate and compare the two variants of operation in terms of steady running and short-circuit conditions in the network at 110 kV and then implement operational and technical measures. The introduction describes the electricity system and its parts. The theoretical part of the paper discusses ways of dealing with steady running and short circuit conditions of long lines. Practical part will deal with applications of knowledge on the network. The conclusion summarizes the most relevant information and the results assessed both variants.
Power Losses Calculation Depending on Distribution Network Configuration
Domes, František ; Souček, Jan (referee) ; Paar, Martin (advisor)
This master‘s thesis deals with the calculation of losses depending on the configuration of the distribution network. The first part focuses on the general theory regarding some used calculation methods of steady operation. The next part is theoreticly dedicated to the technical losses, possibilities of their influencing and their calculation. In the practical part is carried out the choice of calculation method of steady operation. This method is implicated into the proposed program in programming environment MATLAB.Furthermore, on the basis of a partial measurement in the distribution network and using the proposed program are determined the sizes of offtakes of mesh network. For the existing mesh network is designed its radial operation. In the last part are calculated the losses of this network for both of these mentioned operations.
Power Losses Calculation Depending on Distribution Network Configuration
Domes, František ; Souček, Jan (referee) ; Paar, Martin (advisor)
This master‘s thesis deals with the calculation of losses depending on the configuration of the distribution network. The first part focuses on the general theory regarding some used calculation methods of steady operation. The next part is theoreticly dedicated to the technical losses, possibilities of their influencing and their calculation. In the practical part is carried out the choice of calculation method of steady operation. This method is implicated into the proposed program in programming environment MATLAB.Furthermore, on the basis of a partial measurement in the distribution network and using the proposed program are determined the sizes of offtakes of mesh network. For the existing mesh network is designed its radial operation. In the last part are calculated the losses of this network for both of these mentioned operations.
Stabilized operation and short-circuit conditions within E.ON 110kV power network supplied from Otrokovice 110kV switching station, during the period of 2012
Kuba, Petr ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
This thesis deals with steady running and short-circuit conditions in the 110 kV network, E. ON, fed from 110 kV Otrokovice. Substation Otrokovice ensures system transformation from 400 kV to 110 kV system through three transformers. In order to increase reliability of power supply and improved economy is considered to bridge the transition from the operation of two transformers in bridge operations of the three transformers. However, this brings with it significant worsening of short-circuit conditions in the 110 kV network. The task of this work is to evaluate and compare the two variants of operation in terms of steady running and short-circuit conditions in the network at 110 kV and then implement operational and technical measures. The introduction describes the electricity system and its parts. The theoretical part of the paper discusses ways of dealing with steady running and short circuit conditions of long lines. Practical part will deal with applications of knowledge on the network. The conclusion summarizes the most relevant information and the results assessed both variants.
Design of the expansion of 22kV distribution network in a specific area
Řehoř, Jiří ; Beneš, Jan (referee) ; Blažek, Vladimír (advisor)
The aim of this work is the reconstruction and development of the distribution network of DS to ensure electricity supply in the required quality to existing customers and new customers connecting to the planned industrial zone Šlapanice. The first part deals with the inclusion of a distribution network in power system, its distribution and composition. Subsequently, the work deals with the description of the management of distribution networks, cable and outdoor leadership and their parameters. It also contains guidelines for the design of high voltage networks. The end of the first part is devoted to calculating the steady operation of the network. In the second part, the proposed project using the PAS DAISY Off-line v 4.00 Bizon. Based on the available evidence is developed steady state operation. We found that lines are overloaded and need to be strengthened with regard to the development of industrial zones and adjusting the network to ensure safe and reliable operation. The conclusion focuses on the economic evaluation of proposed alternatives.
Conceptual design of the reconstruction of an E.ON 22 kV distribution network installed at a specic area
Vepřek, Tomáš ; Nepevná, Vlastimila (referee) ; Blažek, Vladimír (advisor)
The aim of this thesis is a modification of the distribution network (DS) of the city of Brno to ensure power supply in the required quantity and quality for end consumers. Calculation of steady - state operation of distribution network (DS) of Brno is performed in the programme PAS DAISY Off-Line v.4.00 Bison. On the basis of available data (dispatching scheme, load current of stem lines and reserved power of wholesale customers) we will analyze the steady-state of network. We will find out which of the 110/22 kV transformer stations, cable and overhead lines are overloaded and perform network adjustments to ensure safe and reliable operation by 2015. We will identify in which year we will need to build a new power node in the northern part of Brno. The conclusion is focused on technical and economic evaluation of proposed alternative network arrangements.
Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Slavětice 110 kV switching station, during the period of 2011
Nábělek, Ondřej ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
In the Master Thesis discusses the impact of the bridge connecting the transformer to power system connection to a separate transformers. They were first analyzed the method of calculating the steady operation of the network using the Newton iterative method and the method of calculating short-circuit ratios. It describes the area Slavětice 110kV substation, which is the subject of subsequent calculations. It is also elucidating the function of the bridge connection, advantages and disadvantages. The reason for implementing the bridge operation is to increase the reliability of electricity supply to customers but the major disadvantage is the greater technical and economic performance because increased short circuit current and the need for transmission transformer 400/110kV same type with the same parameters. Point is the practical part, which contains already concrete results taken with the dispatcher software Sinaut. There is a short-circuit resistance compared to short-circuit power substation, then the burden of the elements (transformers, lines) for two specified connection alternatives and four interruptions important elements. Finally, it stated that it can be done with the bridge connection which technical measures. It was discovered that in terms of short-circuit ratios in the present time it is not possible to operate the bridge connection transformers substation Slavětice 110kV and in terms of very different parameters of transformers 400/110kV the operation is not recommended.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.