National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Project management of highway repair
Čermák, Adam ; Tesárek, Václav (referee) ; Juřica, Pavel (advisor)
The diploma thesis deals with the project of repairing of the motorway section and designes the most suitable construction variant. The aim of this work is to select the most suitable variant of repair of the highway section. Consequently to propose a method for reducing possible risks. The diploma thesis contains three variants of construction of the motorway, the shortest variant 3 was selected from all. The option 3 has the lowest cost and uses resources of associated companies most effectively. For this variant was necessary to reduce the potential risks - the risk connected with the completion before the winter technological break. The method of compression and acceleration was used to eliminate the risk. The selection was made on the basis of an economic evaluation of the construction company, especially the financial situation. According to financial indicators was found that the company is in a suitable financial situation for the project to repair the highway section.
Project management of highway repair
Čermák, Adam ; Tesárek, Václav (referee) ; Juřica, Pavel (advisor)
The diploma thesis deals with the project of repairing of the motorway section and designes the most suitable construction variant. The aim of this work is to select the most suitable variant of repair of the highway section. Consequently to propose a method for reducing possible risks. The diploma thesis contains three variants of construction of the motorway, the shortest variant 3 was selected from all. The option 3 has the lowest cost and uses resources of associated companies most effectively. For this variant was necessary to reduce the potential risks - the risk connected with the completion before the winter technological break. The method of compression and acceleration was used to eliminate the risk. The selection was made on the basis of an economic evaluation of the construction company, especially the financial situation. According to financial indicators was found that the company is in a suitable financial situation for the project to repair the highway section.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.