National Repository of Grey Literature 3 records found  Search took 0.00 seconds. 
City circle road Blanka, tunnel Královská obora - mined section, preparation and building construction technology
Kobielusz, Petr ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
My thesis is focused on process preparation and building construction technology of primary lining road tunnel, implemented in city part of Troja in the capital city Prague. Specifically it is a part of tunnel complex Blanka. The name of this part is Kralovská obora. If the all tunnel parts are built this tunnel complex Blanka can be complemented to already opened tunnels Zlíchovský, Mrázovka and Strahovský which are the part of city traffic circle. This technology preparation includes schedules and financial plans of the building, technological prescription for the primary tunnel lining, safety plan, control and trial/test plans, environmental plan, project of construction site, design of the main working machines, items budget of the north tunnel tube, coordination situation plan with wider relationships transport routes and technical report of building technological project.
City circle road Blanka, tunnel Královská obora - mined section, preparation and building construction technology
Kobielusz, Petr ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
My thesis is focused on process preparation and building construction technology of primary lining road tunnel, implemented in city part of Troja in the capital city Prague. Specifically it is a part of tunnel complex Blanka. The name of this part is Kralovská obora. If the all tunnel parts are built this tunnel complex Blanka can be complemented to already opened tunnels Zlíchovský, Mrázovka and Strahovský which are the part of city traffic circle. This technology preparation includes schedules and financial plans of the building, technological prescription for the primary tunnel lining, safety plan, control and trial/test plans, environmental plan, project of construction site, design of the main working machines, items budget of the north tunnel tube, coordination situation plan with wider relationships transport routes and technical report of building technological project.
Verification of the possibility of utilization of rockbolt technology in the Nováky colliery conditions
Koníček, Petr ; Souček, Kamil ; Šňupárek, Richard ; Hrabovský, J.
Deformation of longwall gates are significant mining complication in conditions of mining of thickness brown coal seams. Difficult mining conditions are coped with standard way – reduced steel arch support spacing, wood polygon supports and timber poles etc. Presented contribution introduces the first step to application bolt technology for strengthening of current longwall gate support. In roadway No. 111 114-05 was installed dozen set of glass fibre reinforce plastic grouted rockbolts K60-25 by polyester resin Lokset in conditions of Nováky Colliery. Afterwards it was carried out pull tests of rockbolts, their assessment and it was defined recommendation for rockbolts using in conditions of Nováky Colliery

Interested in being notified about new results for this query?
Subscribe to the RSS feed.