National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Project management of the construction of a historical building with the current sources
Lesonická, Lenka ; Navrátilová, Helena (referee) ; Nový, Martin (advisor)
The thesis sets forth a proposal for possible solutions in the construction of the Pyramid of Cheops using current resources and 21st century technology. The management of the construction, basic regulations, contractual arrangements, and principles are described in the introduction. The body of the thesis gives a detailed description of the dimensions of the newly constructed pyramid and the types of technologies and materials that will be needed to realize the project. Financial costs, scheduling, and the progress of the construction will also form as an integral part of this thesis. The thesis will also concentrate on the equipment and all related follow up activities.
Project management of the construction of a historical building with the current sources
Lesonická, Lenka ; Navrátilová, Helena (referee) ; Nový, Martin (advisor)
The thesis sets forth a proposal for possible solutions in the construction of the Pyramid of Cheops using current resources and 21st century technology. The management of the construction, basic regulations, contractual arrangements, and principles are described in the introduction. The body of the thesis gives a detailed description of the dimensions of the newly constructed pyramid and the types of technologies and materials that will be needed to realize the project. Financial costs, scheduling, and the progress of the construction will also form as an integral part of this thesis. The thesis will also concentrate on the equipment and all related follow up activities.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.