National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.
Prestressed box girder bridge
Štíchová, Kateřina ; Štefan, Petr (referee) ; Koláček, Jan (advisor)
The subject of this diploma thesis is the design of a load–bearing structure, whitch is situated in the extravillain between the town of Chomutov and the village Křimov. Main purpose of this structure is to pass a roadway I/7 across the valley. There are three options of design and one of them – the prestressed box girder bridge with slanted walls is chosen for more detailed elaboration. The major load–bearing structure is five–span with lenghts 46.50 + 58.00 + 58.00 + 58.00 + 46.50 m, made of post–tensioned nad cast–in–place concrete. The total lenght of load–bearing structure is 269.00 m and the width of load–bearing structure is 13.50 m, the bridge is straight in plan. The structure is analyzed by several computational models, which are designed in Scia Engineer 20.0 software. The structure is analysed in longitudinal and cross directions. The assessments of load state limit and usability limit state are made according to valid standards. This thesis also included time dependent analysis (TDA), that takes construction stage analysis into account.
Prestressed box girder bridge
Štíchová, Kateřina ; Štefan, Petr (referee) ; Koláček, Jan (advisor)
The subject of this diploma thesis is the design of a load–bearing structure, whitch is situated in the extravillain between the town of Chomutov and the village Křimov. Main purpose of this structure is to pass a roadway I/7 across the valley. There are three options of design and one of them – the prestressed box girder bridge with slanted walls is chosen for more detailed elaboration. The major load–bearing structure is five–span with lenghts 46.50 + 58.00 + 58.00 + 58.00 + 46.50 m, made of post–tensioned nad cast–in–place concrete. The total lenght of load–bearing structure is 269.00 m and the width of load–bearing structure is 13.50 m, the bridge is straight in plan. The structure is analyzed by several computational models, which are designed in Scia Engineer 20.0 software. The structure is analysed in longitudinal and cross directions. The assessments of load state limit and usability limit state are made according to valid standards. This thesis also included time dependent analysis (TDA), that takes construction stage analysis into account.
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.