National Repository of Grey Literature 3 records found  Search took 0.01 seconds. 
Storage hall
Ščudla, Pavel ; Kalánek, Jiří (referee) ; Ostrý, Milan (advisor)
The master´s thesis on the topic Storage hall is processed in the form of project documentation for the realization of the new building. This building is projected on a plot 2828/108, 2828/106, 2828/105, 2828/104, 2828/222 and 2828/107 in the cadastral area Brno – Cernovice. This building is adjoined to the existing production hall and is divided into two parts. This parts are storage and administration. The administrative part has two floors and includes office space and hygienic facilities for own employees. The storage part is determined for storing of plastic products.
Sports Center
Krampla, Jan ; Havířová, Zdeňka (referee) ; Lavický, Miloš (advisor)
The subject of the masters thesis is the new construction of a object for sport which is located in sport area Dukla in Pardubice. The building has a basement with parking and one floor with sport hall and other parts. The object is covered with flat roof. In the background of the building there is reception with bufet, changing rooms, toilets, showers, saunas and cooling pool, massage room and Kneipp walk. The utility roon is located in the basement. Entrance to the building is on the west side where there is also parking lot with walk leading to entrance. The object is made of collumns made of reinforced concrete and slabs of the same material. The outer fasade of the object is made from ceramic blocks Porotherm and insulated with ETICS system with the width of 200 mm
Storage hall
Ščudla, Pavel ; Kalánek, Jiří (referee) ; Ostrý, Milan (advisor)
The master´s thesis on the topic Storage hall is processed in the form of project documentation for the realization of the new building. This building is projected on a plot 2828/108, 2828/106, 2828/105, 2828/104, 2828/222 and 2828/107 in the cadastral area Brno – Cernovice. This building is adjoined to the existing production hall and is divided into two parts. This parts are storage and administration. The administrative part has two floors and includes office space and hygienic facilities for own employees. The storage part is determined for storing of plastic products.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.