National Repository of Grey Literature 3 records found  Search took 0.00 seconds. 
BIM model – Tomkovo náměstí in Brno
Frýdecký, Filip ; Gottvaldová, Jana (referee) ; Remeš, Josef (advisor)
The subject of this thesis is to show implementation of BIM in linear structures such as roads. In this case there was a normal 2D project, which I must convert to 3D model, using programme Civil 3D. For non-graphical information, standard from SFDI was used at its highest level of documentation that time (PDPS level). After finalizing all graphical and non-graphical information, part of the model was later converted in 5D model, adding cost and schedule. This thesis is supposed to show application of BIM in linear structures such as roads and point out problems from software side such as norms and methodology.
Impact of 3D modelling on road design
Indruchová, Sára ; Gottvaldová, Jana (referee) ; Kosňovský, Michal (advisor)
This diploma thesis is based on creating a 3D model focused on transport constructions. The aim of the thesis is to find certain advantages and disadvantages in different design approaches. The theoretical part compares the difference between the 3D model and the BIM model, the advantages and difficulties of modelling and the use of the model in practice are pointed out as well. The practical part of this work includes the transformation of chosen road constructions and existing enginerring network from the 2D to the 3D model. The main source is already existing drawing document in DPS level which serves as the basis for this thesis.
BIM model – Tomkovo náměstí in Brno
Frýdecký, Filip ; Gottvaldová, Jana (referee) ; Remeš, Josef (advisor)
The subject of this thesis is to show implementation of BIM in linear structures such as roads. In this case there was a normal 2D project, which I must convert to 3D model, using programme Civil 3D. For non-graphical information, standard from SFDI was used at its highest level of documentation that time (PDPS level). After finalizing all graphical and non-graphical information, part of the model was later converted in 5D model, adding cost and schedule. This thesis is supposed to show application of BIM in linear structures such as roads and point out problems from software side such as norms and methodology.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.