National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Highway bridge over wide wally
Mertová, Eliška ; Smejkal, Ing David (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis was the design of three possible variants, how to span the wide and deep valley with a bridge. After an evaluation, situation of the highway on the only wide load-bearing structure which is constituted by a box girder with transverse cantilevers supported by prefabricated bar braces, was chosen as an optimal solving. The load- bearing structure made of post- tensioned concrete is going to be incrementally launched and be supported by one-column pillars along an axis of the motorway. The work is composed of a detailed design of this preferred variant, which is processed according to the ultimate and serviceability limit state including the construction stage analysis of the bridge by the construction technology by an incremental launching method.
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.
Highway bridge over wide wally
Mertová, Eliška ; Smejkal, Ing David (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis was the design of three possible variants, how to span the wide and deep valley with a bridge. After an evaluation, situation of the highway on the only wide load-bearing structure which is constituted by a box girder with transverse cantilevers supported by prefabricated bar braces, was chosen as an optimal solving. The load- bearing structure made of post- tensioned concrete is going to be incrementally launched and be supported by one-column pillars along an axis of the motorway. The work is composed of a detailed design of this preferred variant, which is processed according to the ultimate and serviceability limit state including the construction stage analysis of the bridge by the construction technology by an incremental launching method.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.