National Repository of Grey Literature 6 records found  Search took 0.01 seconds. 
Center of leisure activities
Kaňovský, Michal ; Utíkal, Aleš (referee) ; Utíkalová, Ivana (advisor)
This diploma thesis presents a project documentation for construction of a center of leisure activities. It's construction site located on the outskirts of town Třebíč, "Na Kopcích" street. The building is composed from the two visual and three service parts which are connected to each other. On the left side in first floor there is a bowling with services and the second floor will serve for sport activities of jumping, spinning or relax massages. On the right side of building will be usable for education or for leisure activities. The building is designed as a two floors with partial basement. The construction system is formed by longitudinal wall system with precast hollow core slab or reinforced concrete slab. The structure is based on strip foundations with walls of permanent formwork. External wall is based on clay brick of therm type. The staircase is designed as prefabricated element or cast-in-place reinforced concrete. The roof is constructed as warm flat green roof with expanded polystyrene with screed to fall.
Kindergarden
Musilová, Hana ; Sláma, Ludvík (referee) ; Mohelníková, Jitka (advisor)
Diploma thesis is processed in the form design documentation for constrution. New bulding of the kindergarten is situated in a cadastre unit of Blansko town. Building is located on a flat terrain.„T“ shaped building is designes as a double-storey in one part, second part of the building is single-story. A construction systém is bricked from ceramic block and it has no basement. The building is roofed by non-walkable flat roof. Part of the building is roofed by a ealkable flat terrace. A ceiling construction is made by hollow core slab. The kindergarten is consisted of three departmen, each for 20 children. There is a kizchen, offices, technical area and office for a logopedie in the building
Multi-storey precast structure
Polák, Marek ; Šimůnek, Petr (referee) ; Perla, Jan (advisor)
The final thesis is focused on reworking hospital pavilion from cast-in-place structure to precast concrete frame. Calculation of internal forces is made by software system SCIA Engineer. Main load-bearing elements are inner beam, outside beam and all columns in axis 2-C. This thesis contains assembly report, structural design, calculations and drawings of the designed parts, joint details, assembly material drawing and hand calculation.
Center of leisure activities
Kaňovský, Michal ; Utíkal, Aleš (referee) ; Utíkalová, Ivana (advisor)
This diploma thesis presents a project documentation for construction of a center of leisure activities. It's construction site located on the outskirts of town Třebíč, "Na Kopcích" street. The building is composed from the two visual and three service parts which are connected to each other. On the left side in first floor there is a bowling with services and the second floor will serve for sport activities of jumping, spinning or relax massages. On the right side of building will be usable for education or for leisure activities. The building is designed as a two floors with partial basement. The construction system is formed by longitudinal wall system with precast hollow core slab or reinforced concrete slab. The structure is based on strip foundations with walls of permanent formwork. External wall is based on clay brick of therm type. The staircase is designed as prefabricated element or cast-in-place reinforced concrete. The roof is constructed as warm flat green roof with expanded polystyrene with screed to fall.
Kindergarden
Musilová, Hana ; Sláma, Ludvík (referee) ; Mohelníková, Jitka (advisor)
Diploma thesis is processed in the form design documentation for constrution. New bulding of the kindergarten is situated in a cadastre unit of Blansko town. Building is located on a flat terrain.„T“ shaped building is designes as a double-storey in one part, second part of the building is single-story. A construction systém is bricked from ceramic block and it has no basement. The building is roofed by non-walkable flat roof. Part of the building is roofed by a ealkable flat terrace. A ceiling construction is made by hollow core slab. The kindergarten is consisted of three departmen, each for 20 children. There is a kizchen, offices, technical area and office for a logopedie in the building
Multi-storey precast structure
Polák, Marek ; Šimůnek, Petr (referee) ; Perla, Jan (advisor)
The final thesis is focused on reworking hospital pavilion from cast-in-place structure to precast concrete frame. Calculation of internal forces is made by software system SCIA Engineer. Main load-bearing elements are inner beam, outside beam and all columns in axis 2-C. This thesis contains assembly report, structural design, calculations and drawings of the designed parts, joint details, assembly material drawing and hand calculation.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.