National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
District Police Department of the Czech Republic in Brno-Bohunice, Preparation for Construction
Dubecký, Tomáš ; Brandtner, Michal (referee) ; Šlanhof, Jiří (advisor)
The aim of the diploma thesis is to prepare the construction called the District Police Department of the Czech Republic in Brno, Bohunice. The diploma thesis contains a technical report on the construction technology project, which deals with architectural and construction design solutions, coordination situation and transport routes, where critical points are assessed time and financial plan of construction, where all construction objects are described with their time and financial schedule, a study of the implementation of the main construction stages, which addresses the various stages of construction. The diploma thesis contains a technical report, item budget, plan for the establishment and liquidation of buildings and drawings of construction site equipment for each stage, design of the main construction machinery for the construction. A detailed time plan of the main building, a plan of its supply of materials for the rough construction was prepared for the given construction. Furthermore, the work contains a technological regulation for a reinforced concrete monolithic staircase, which is related to the control and test plan for a reinforced concrete monolithic staircase. The next assignment deals with the item budget of the main building for the rough construction, the drawing of the formwork for the reinforced concrete monolithic staircase and the economic assessment and evaluation of construction cranes.
District Police Department of the Czech Republic in Brno-Bohunice, Preparation for Construction
Dubecký, Tomáš ; Brandtner, Michal (referee) ; Šlanhof, Jiří (advisor)
The aim of the diploma thesis is to prepare the construction called the District Police Department of the Czech Republic in Brno, Bohunice. The diploma thesis contains a technical report on the construction technology project, which deals with architectural and construction design solutions, coordination situation and transport routes, where critical points are assessed time and financial plan of construction, where all construction objects are described with their time and financial schedule, a study of the implementation of the main construction stages, which addresses the various stages of construction. The diploma thesis contains a technical report, item budget, plan for the establishment and liquidation of buildings and drawings of construction site equipment for each stage, design of the main construction machinery for the construction. A detailed time plan of the main building, a plan of its supply of materials for the rough construction was prepared for the given construction. Furthermore, the work contains a technological regulation for a reinforced concrete monolithic staircase, which is related to the control and test plan for a reinforced concrete monolithic staircase. The next assignment deals with the item budget of the main building for the rough construction, the drawing of the formwork for the reinforced concrete monolithic staircase and the economic assessment and evaluation of construction cranes.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.