National Repository of Grey Literature 3 records found  Search took 0.01 seconds. 
BIM model – Tomkovo náměstí in Brno
Frýdecký, Filip ; Gottvaldová, Jana (referee) ; Remeš, Josef (advisor)
The subject of this thesis is to show implementation of BIM in linear structures such as roads. In this case there was a normal 2D project, which I must convert to 3D model, using programme Civil 3D. For non-graphical information, standard from SFDI was used at its highest level of documentation that time (PDPS level). After finalizing all graphical and non-graphical information, part of the model was later converted in 5D model, adding cost and schedule. This thesis is supposed to show application of BIM in linear structures such as roads and point out problems from software side such as norms and methodology.
Study of Tram Track Extension to the City District Brno-Bosonohy
Hozáková, Bettina ; Kuchár, Martin (referee) ; Valehrach, Jan (advisor)
This study elaborates four options of the extension of the tram track Brno-Bosonohy, which are subsequently compared according to the impact on the urban structure and the possibility of its adaptation to the street area. The thesis examines the Brno City Zoning Plan and the Bosonohy Zoning Study, its documents are used as a basis of the concept, further defines the terms of the principles of tram track design, and describes the strengths and weaknesses of the elaborated options. The study also covers the design of tram stops and a loop, as well as a potential roundabout with a tram track running through it.
BIM model – Tomkovo náměstí in Brno
Frýdecký, Filip ; Gottvaldová, Jana (referee) ; Remeš, Josef (advisor)
The subject of this thesis is to show implementation of BIM in linear structures such as roads. In this case there was a normal 2D project, which I must convert to 3D model, using programme Civil 3D. For non-graphical information, standard from SFDI was used at its highest level of documentation that time (PDPS level). After finalizing all graphical and non-graphical information, part of the model was later converted in 5D model, adding cost and schedule. This thesis is supposed to show application of BIM in linear structures such as roads and point out problems from software side such as norms and methodology.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.