National Repository of Grey Literature 3 records found  Search took 0.00 seconds. 
Project planning and management of construction residential houses in the file Štětí
Sládek, Lukáš ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
The subject of this thesis is the preparation and organization of construction of residential buildings in Štětí. In the technological regulations deal with all the layers of flooring from the ceiling construction in residential buildings. The objects are hard floors. For floor coverings will be used PVC roofing, ceramic tiles and concrete coating. It will be used for machining of concrete. Next, I will discuss technological instruction, timing, valuation of all technological stages, construction site equipment, health and safety at work. Also here describe the proper allocation of construction processes into sub-processes to technological stage of completion of work most effectively achieve the objective.
Project planning and management of construction residential houses in the file Štětí
Sládek, Lukáš ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
The subject of this thesis is the preparation and organization of construction of residential buildings in Štětí. In the technological regulations deal with all the layers of flooring from the ceiling construction in residential buildings. The objects are hard floors. For floor coverings will be used PVC roofing, ceramic tiles and concrete coating. It will be used for machining of concrete. Next, I will discuss technological instruction, timing, valuation of all technological stages, construction site equipment, health and safety at work. Also here describe the proper allocation of construction processes into sub-processes to technological stage of completion of work most effectively achieve the objective.
Piscicultural and Environmental Aspects of the Revitalization of the Návežný Pond
ČERNÝ, Pavel
The aim of this thesis was to document the various stages of restoration Návežný Pond ? ?Návesný? in the cadastral Branišov. The revitalization was used Operating Environment Programme, Priority Axis 6.4. - Optimization of the landscape. The hydrological parameters were monitored pond dredging, restoration of security overflow and bypass sewer. The revitalization was to increase the retention capacity of the pond using pond sediment extraction and subsequently by increased flood protection. Another important part of the revitalization is to restore the old defunct sewer bypass construction and safety overflow for the flood. Dredging is important to perform due to animal hygiene pond environment, biodiversity ecosystem pond, retention pond production capability and protection against floods. Due to the long-term return on investment is appropriate to use financial aid as grants. For the evaluation of most subsidies have been compared three grant degrees.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.