National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
Distribution Network Development and Configuration
Pospíšil, Petr ; Beneš, Jan (referee) ; Topolánek, David (advisor)
The theme of this master‘s thesis is distribution network development and configuration in the part of Brno – Trnitá. There is expected to be investments there in the next few years. The thesis consists of two parts. For better understanding of this problem, the first theoretical part concerns with the description of electrical network (subdivision in accordance with voltage levels, conductor types, network types and other electrical network parts), solution of grid’s steady state (as a linear task and also non-linear task, elimination of the balancing node, the iterative method) and Brno distribution network characteristics. The second part concerns with distribution network development and configuration depending on anticipated load development in Trnitá. The result is proposal for transformer station construction Opuštěná fitted with three transformers of nominal output SN = 40 MVA and network configuration change required both for providing new consumption supply as well as sustaining current one.
Distribution Network Development and Configuration
Pospíšil, Petr ; Beneš, Jan (referee) ; Topolánek, David (advisor)
The theme of this master‘s thesis is distribution network development and configuration in the part of Brno – Trnitá. There is expected to be investments there in the next few years. The thesis consists of two parts. For better understanding of this problem, the first theoretical part concerns with the description of electrical network (subdivision in accordance with voltage levels, conductor types, network types and other electrical network parts), solution of grid’s steady state (as a linear task and also non-linear task, elimination of the balancing node, the iterative method) and Brno distribution network characteristics. The second part concerns with distribution network development and configuration depending on anticipated load development in Trnitá. The result is proposal for transformer station construction Opuštěná fitted with three transformers of nominal output SN = 40 MVA and network configuration change required both for providing new consumption supply as well as sustaining current one.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.