Conceptual design of the reconstruction of an E.ON 22 kV distribution network installed at a specic area
Vepřek, Tomáš ; Nepevná, Vlastimila (referee) ; Blažek, Vladimír (advisor)
The aim of this thesis is a modification of the distribution network (DS) of the city of Brno to ensure power supply in the required quantity and quality for end consumers. Calculation of steady - state operation of distribution network (DS) of Brno is performed in the programme PAS DAISY Off-Line v.4.00 Bison. On the basis of available data (dispatching scheme, load current of stem lines and reserved power of wholesale customers) we will analyze the steady-state of network. We will find out which of the 110/22 kV transformer stations, cable and overhead lines are overloaded and perform network adjustments to ensure safe and reliable operation by 2015. We will identify in which year we will need to build a new power node in the northern part of Brno. The conclusion is focused on technical and economic evaluation of proposed alternative network arrangements.
Design of the expansion of 22kV distribution network in a specific area
Řehoř, Jiří ; Beneš, Jan (referee) ; Blažek, Vladimír (advisor)
The aim of this work is the reconstruction and development of the distribution network of DS to ensure electricity supply in the required quality to existing customers and new customers connecting to the planned industrial zone Šlapanice. The first part deals with the inclusion of a distribution network in power system, its distribution and composition. Subsequently, the work deals with the description of the management of distribution networks, cable and outdoor leadership and their parameters. It also contains guidelines for the design of high voltage networks. The end of the first part is devoted to calculating the steady operation of the network. In the second part, the proposed project using the PAS DAISY Off-line v 4.00 Bizon. Based on the available evidence is developed steady state operation. We found that lines are overloaded and need to be strengthened with regard to the development of industrial zones and adjusting the network to ensure safe and reliable operation. The conclusion focuses on the economic evaluation of proposed alternatives.
Design of the expansion of 22kV distribution network in a specific area
Řehoř, Jiří ; Beneš, Jan (referee) ; Blažek, Vladimír (advisor)
The aim of this work is the reconstruction and development of the distribution network of DS to ensure electricity supply in the required quality to existing customers and new customers connecting to the planned industrial zone Šlapanice. The first part deals with the inclusion of a distribution network in power system, its distribution and composition. Subsequently, the work deals with the description of the management of distribution networks, cable and outdoor leadership and their parameters. It also contains guidelines for the design of high voltage networks. The end of the first part is devoted to calculating the steady operation of the network. In the second part, the proposed project using the PAS DAISY Off-line v 4.00 Bizon. Based on the available evidence is developed steady state operation. We found that lines are overloaded and need to be strengthened with regard to the development of industrial zones and adjusting the network to ensure safe and reliable operation. The conclusion focuses on the economic evaluation of proposed alternatives.
Conceptual design of the reconstruction of an E.ON 22 kV distribution network installed at a specic area
Vepřek, Tomáš ; Nepevná, Vlastimila (referee) ; Blažek, Vladimír (advisor)
The aim of this thesis is a modification of the distribution network (DS) of the city of Brno to ensure power supply in the required quantity and quality for end consumers. Calculation of steady - state operation of distribution network (DS) of Brno is performed in the programme PAS DAISY Off-Line v.4.00 Bison. On the basis of available data (dispatching scheme, load current of stem lines and reserved power of wholesale customers) we will analyze the steady-state of network. We will find out which of the 110/22 kV transformer stations, cable and overhead lines are overloaded and perform network adjustments to ensure safe and reliable operation by 2015. We will identify in which year we will need to build a new power node in the northern part of Brno. The conclusion is focused on technical and economic evaluation of proposed alternative network arrangements.