National Repository of Grey Literature 3 records found  Search took 0.02 seconds. 
SEKT WINERY JAN PETRÁK
Boháč, David ; Helis, Jan (referee) ; Dýr, Petr (advisor) ; Petříček, Tomáš (advisor)
THE ASSIGNMENT OF THE BACHELOR THESIS IS A DESIGN OF A NEW BUILDING OF THE SEKT JAN PETRÁK WINERY 'S AGRICULTURAL PRODUCTION FACILITY IN THE WINE AREA OF SOUTH MORAVIA IN THE VILLAGE OF KOBYLÍ IN MORAVIA. THE BACHELOR THESIS FOLLOWS THE STUDY PREPARED IN THE FRAMEWORK OF SUBJECT AG032. THE AIM OF THE STUDY WAS TO PERFORM A DISPOSITION- FUNCTIONAL AND ARCHITECTURAL SOLUTION. THE AIM OF THE BACHELOR THESIS IS TO DEVELOP THE STUDY AND DEVELOP A PROJECT DOCUMENTATION FOR THE CONSTRUCTION PERMIT AND FOR THE CONSTRUCTION OF THE CONSTRUCTION. THE CONSTRUCTION SITE IS LOCATED IN THE VILLAGE OF KOBYLÍ IN MORAVIA, WHERE THE PLOT WAS ENTERED. THE CONSTRUCTION WAS DIVIDED INTO TWO FUNCTIONAL UNITS. MAIN BUILDING SPECIALLY FOCUSED ON SPARKLING PRODUCTION, REPRESENTATION AND ACCOMMODATION. THE SECOND FUNCTIONAL UNIT IS A ONE-STOREY PRODUCTION HALL FOR THE PRODUCTION OF SILENT WINES AND A PREPARATORY FOR THE PRODUCTION OF SPARKLING WINE. THE FORM OF THE MAIN BUILDING AND THE PRODUCTION HALL IS DESIGNED IN RELATION TO THE ARCHITECTURAL FORMS OF THE MUNICIPALITY. THE MAIN BUILDING IS THREE-FLOOR AND WITH ONE UNDERGROUND FLOOR. THERE ARE PRODUCTION AND TASTING HERE. THE UNDERGROUND FLOOR LEVELS THE SLOPE TERRAIN OF THE Plot. THE FIRST ABOVE GROUND FLOOR SERVES REPRESENTATIVELY WITH THE STORE AND WINE BAR. THE SECOND ABOVE FLOOR IS DESIGNED FOR ACCOMMODATION OF UP TO 12 GUESTS. THE WINE COURT PROVIDES A PARKING SPACE AND HANDLING SPACE FOR PRODUCTION. DVAV DESIGNS ARE DESIGNED FOR THE CONTINUOUS ARRIVAL AND DEPARTURE OF THE AREA. THE AREA HAS BEEN DESIGNED WITHOUT BARRIER-FREE.
Family winery Plchut Mutěnice
Mahdalík, Jakub ; Bílek, Zdeněk (referee) ; Dýr, Petr (advisor)
THE ASSIGNMENT OF THE BACHELOR'S THESIS IS THE DESIGN OF THE NEW BUILDING OF THE PLCHUT FAMILY WINERY IN MUTĚNICE, IN THE SOUTH MORAVIA WINE REGION. THE BACHELOR'S THESIS IS BASED ON THE STUDY WHICH WAS DEVELOPED WITHIN THE SUBJECT AG032. THE OBJECTIVE OF THE ARCHITECTURAL STUDY WAS TO IMPLEMENT THE DESIGN OF THE WINERY WHICH INCLUDED AN ADMINISTRATIVE FACILITY AND A PRODUCTION FACILITY. THE GOAL OF THE BACHELOR'S THESIS IS TO DEVELOP THIS STUDY AND DEVELOP PROJECT DOCUMENTATION AT THE STAGE FOR BUILDING PERMIT AND IMPLEMENTATION OF CONSTRUCTION. THE ALLOCATED LAND IS LOCATED ON THE WESTERN EDGE OF THE MUNICIPALITY OF MUTĚNICE IN THE SOUTH MORAVIAN REGION. THE DESIGN IS DIVIDED INTO TWO INDEPENDENT OBJECTS. ONE OF THE OBJECTS IS A PRODUCTION HALL FOR WINE PRODUCTION. ADMINISTRATION AND ACCOMMODATION ARE LOCATED IN THE SECOND BUILDING. THE DESIGNED OBJECT RESPECTS THE EXPRESSION OF THE SURROUNDING LANDSCAPE AND IS DESIGNED IN RELATION TO THE ARCHITECTURAL EXPRESSION OF THE VILLAGE. OBJECT OF THE PRODUCTION HALL IS ONE FLOOR. PRODUCTION AND WAREHOUSES ARE LOCATED HERE. THE YARD OFFERS A PLACE FOR PARKING, HANDLING AREA AND SPACE FOR A FILLING LINE. THERE ARE 3 ENTRANCES DESIGNED TO THE BUILDING OF PRODUCTION. THE ADMINISTRATION BUILDING IS GROUND FLOOR WITH ONE UNDERGROUND FLOOR. THE FIRST GROUND FLOOR IS USED FOR THE PRESENTATION AND SALE OF WINES, FOR ACCOMMODATION IN TWO APARTMENTS AND FOR ADMINISTRATION. THE UNDERGROUND FLOOR IS USED FOR THE ARCHIVING AND TASTING OF WINES. THERE ARE FACILITIES FOR THE PREPARATION OF SMALL REFRESHMENTS, A TECHNICAL ROOM AND TOILETS TOO. ONE SUPPLY ENTRANCE IS PROPOSED TO THE LOT. THE PARKING LOT AND THE ENTRANCE TO THE SOUTH OF THE PROPERTY SERVE FOR VISITORS. THE AREA IS DESIGNED TO BE BARRIER-FREE.
SEKT WINERY JAN PETRÁK
Boháč, David ; Helis, Jan (referee) ; Dýr, Petr (advisor) ; Petříček, Tomáš (advisor)
THE ASSIGNMENT OF THE BACHELOR THESIS IS A DESIGN OF A NEW BUILDING OF THE SEKT JAN PETRÁK WINERY 'S AGRICULTURAL PRODUCTION FACILITY IN THE WINE AREA OF SOUTH MORAVIA IN THE VILLAGE OF KOBYLÍ IN MORAVIA. THE BACHELOR THESIS FOLLOWS THE STUDY PREPARED IN THE FRAMEWORK OF SUBJECT AG032. THE AIM OF THE STUDY WAS TO PERFORM A DISPOSITION- FUNCTIONAL AND ARCHITECTURAL SOLUTION. THE AIM OF THE BACHELOR THESIS IS TO DEVELOP THE STUDY AND DEVELOP A PROJECT DOCUMENTATION FOR THE CONSTRUCTION PERMIT AND FOR THE CONSTRUCTION OF THE CONSTRUCTION. THE CONSTRUCTION SITE IS LOCATED IN THE VILLAGE OF KOBYLÍ IN MORAVIA, WHERE THE PLOT WAS ENTERED. THE CONSTRUCTION WAS DIVIDED INTO TWO FUNCTIONAL UNITS. MAIN BUILDING SPECIALLY FOCUSED ON SPARKLING PRODUCTION, REPRESENTATION AND ACCOMMODATION. THE SECOND FUNCTIONAL UNIT IS A ONE-STOREY PRODUCTION HALL FOR THE PRODUCTION OF SILENT WINES AND A PREPARATORY FOR THE PRODUCTION OF SPARKLING WINE. THE FORM OF THE MAIN BUILDING AND THE PRODUCTION HALL IS DESIGNED IN RELATION TO THE ARCHITECTURAL FORMS OF THE MUNICIPALITY. THE MAIN BUILDING IS THREE-FLOOR AND WITH ONE UNDERGROUND FLOOR. THERE ARE PRODUCTION AND TASTING HERE. THE UNDERGROUND FLOOR LEVELS THE SLOPE TERRAIN OF THE Plot. THE FIRST ABOVE GROUND FLOOR SERVES REPRESENTATIVELY WITH THE STORE AND WINE BAR. THE SECOND ABOVE FLOOR IS DESIGNED FOR ACCOMMODATION OF UP TO 12 GUESTS. THE WINE COURT PROVIDES A PARKING SPACE AND HANDLING SPACE FOR PRODUCTION. DVAV DESIGNS ARE DESIGNED FOR THE CONTINUOUS ARRIVAL AND DEPARTURE OF THE AREA. THE AREA HAS BEEN DESIGNED WITHOUT BARRIER-FREE.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.