National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Cultural center Puppet
Kuchaříková, Andrea ; Kalánek, Ing Jiří (referee) ; Brzoň, Roman (advisor)
This diploma thesis presents a project documentation for construction of a community centre with a restaurant. Its construction site is located on the outskirts of town Jaroměřice nad Rokytnou, Poděbradova street. The building is composed from three parts, which are connected to each other. The first part houses the restaurant with its facilities. This part is a single floor structure covered by a flat green roof. Its façade is formed by white boards composed into an asymmetrical pattern. The second part serves as a backstage area where all the necessary facilities are located. This second part of the building is as the first part a single floor structure covered by a flat green roof. Its façade is formed by façade timber boards. The main entrance is located in the middle part, which is the third part the building. It has two floors and it houses an auditorium, a bar and amenities. Its façade is formed by trapezial boards. The construction system is formed by load bearing walls and by prestressed concreted floor panels or in some parts by cast-in-place reinforced concrete slabs. The building has strip foundations. Its interior walls are built from sand-limestone bricks with acoustic properties. The perimeter walls are covered with ventilated façade with mineral wool thermal insulation. The heating of the community centre is powered by gas boiler connected to single-vent chimney with ventilation shaft.
Cultural center Puppet
Kuchaříková, Andrea ; Kalánek, Ing Jiří (referee) ; Brzoň, Roman (advisor)
This diploma thesis presents a project documentation for construction of a community centre with a restaurant. Its construction site is located on the outskirts of town Jaroměřice nad Rokytnou, Poděbradova street. The building is composed from three parts, which are connected to each other. The first part houses the restaurant with its facilities. This part is a single floor structure covered by a flat green roof. Its façade is formed by white boards composed into an asymmetrical pattern. The second part serves as a backstage area where all the necessary facilities are located. This second part of the building is as the first part a single floor structure covered by a flat green roof. Its façade is formed by façade timber boards. The main entrance is located in the middle part, which is the third part the building. It has two floors and it houses an auditorium, a bar and amenities. Its façade is formed by trapezial boards. The construction system is formed by load bearing walls and by prestressed concreted floor panels or in some parts by cast-in-place reinforced concrete slabs. The building has strip foundations. Its interior walls are built from sand-limestone bricks with acoustic properties. The perimeter walls are covered with ventilated façade with mineral wool thermal insulation. The heating of the community centre is powered by gas boiler connected to single-vent chimney with ventilation shaft.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.