National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Sanitation installation in the hospital
Peřinová, Jitka ; Vaščáková, Alena (referee) ; Vrána, Jakub (advisor)
The task of this diploma thesis is to prepare the design of sanitary and gas pipeline installations in the assigned hospital building. The building has one underground and four above-ground floors. On the underground floor there are technical premises including a boiler room, hygienic facilities of staff and rooms for storage and cleaning. On the first floor there are ambulances of various kinds. Patient rooms are located over the second and third floors. Each room has its own built-in bathroom. There are also doctor's examination rooms and daily room of staff. On the fourth floor there is an ICU. In the theoretical part I deal with the legionella bacterium. I explain what causes this bacterium, what are the conditions for its reproduction, where it occurs and what measures will prevent its multiplication in water pipes. In the next part, I compare two possible variants of the solution of the design of water pipe routes with the subsequent selection of a more suitable option. The calculation part contains all the calculations used to design sewerage, water supply and gas pipeline, including their connection to utilities.
Sanitation installation in a factory
Gerych, Michal ; Bárta, Ladislav (referee) ; Vrána, Jakub (advisor)
The Master´s thesis solves question about sanitation installations in factory in Přelouč. The theoretical part deals with pumping technique and pumping of wastewater. The work also focuses on possible solutions of the given specialization. The project part solves the sanitation installation of this factory in the selected variant. It is a large hall with administrative part.
Sanitation installation in the hospital
Peřinová, Jitka ; Vaščáková, Alena (referee) ; Vrána, Jakub (advisor)
The task of this diploma thesis is to prepare the design of sanitary and gas pipeline installations in the assigned hospital building. The building has one underground and four above-ground floors. On the underground floor there are technical premises including a boiler room, hygienic facilities of staff and rooms for storage and cleaning. On the first floor there are ambulances of various kinds. Patient rooms are located over the second and third floors. Each room has its own built-in bathroom. There are also doctor's examination rooms and daily room of staff. On the fourth floor there is an ICU. In the theoretical part I deal with the legionella bacterium. I explain what causes this bacterium, what are the conditions for its reproduction, where it occurs and what measures will prevent its multiplication in water pipes. In the next part, I compare two possible variants of the solution of the design of water pipe routes with the subsequent selection of a more suitable option. The calculation part contains all the calculations used to design sewerage, water supply and gas pipeline, including their connection to utilities.
Sanitation installation in a factory
Gerych, Michal ; Bárta, Ladislav (referee) ; Vrána, Jakub (advisor)
The Master´s thesis solves question about sanitation installations in factory in Přelouč. The theoretical part deals with pumping technique and pumping of wastewater. The work also focuses on possible solutions of the given specialization. The project part solves the sanitation installation of this factory in the selected variant. It is a large hall with administrative part.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.