National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Preparation for the implementation of a prestressed bridge in the village of Hnojník
Stupka, Matouš ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this diploma thesis is the preparation for the implementation of a prestressed bridge in the village of Hnojník. This thesis contains a technical report, coordination situation of the construction with broader relations to transport routes, phases time shedule, a feasibility study of the main technological phases, project of construction site equipment, a suggested list of the main construction vehicles and building mechanisation, time shedule of main construction, shedule of transport of fresh concrete mixture, technological regulation of concreting bridge deck, technological regulation of additional prestressing bridge deck, control and test plan, health and safety at work on bridge construction, The annexes contain drawings of concept of load-bearing falsework, drawing of the construction site equipment, drawing of coordination situation of the construction with broader relations to transport routes , itemized budget, graph of workers and machines needs, phases time shedule and delivery shedule of fresh concrete mixture.
Installation of reinforced concrete skeleton of hockey hall
Stupka, Matouš ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is the solution of implementation of the assembly stage of the reinforced concrete skeleton of the hockey hall in Kuřim. This thesis contains a technical report focusing on the skeleton assembly, the situation of the construction with broader transport relations, bill of quantities, technological regulation for skeleton assembly, construction organization solution, time schedule, machine assembly design, control and test plan, safety and health protection on construction site plan and transport of excessive and oversized loads solution. The annexes contain drawings of the passages through critical points on the route, a drawing of the construction site facilities, item budget, prefabricated supply scheme, drawings of component assembly diagrams and a graph of workers needs.

See also: similar author names
2 Stupka, Martin
Interested in being notified about new results for this query?
Subscribe to the RSS feed.