National Repository of Grey Literature 244 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
The Sports and education centre - the rough superstructure
Odehnalová, Jana ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
The subject of this bachelor thesis is the technology of rough upper stage of construction of The Sport and education centre in Petrovice. The building has two floors. Outer and inner walls are made of brick system. Internal pillars and ceilings are monolithic reinforced concrete. The work content is a technological regulation, technical reports, site equipment, mechanical design assembly, budget, timing plan, control and testing plan, work safety and environmental protection.
Administrative building with operational warehouses - construction technology project
Hirsch, Roman ; Boháček, Adam (referee) ; Biely, Boris (advisor)
The focus of this thesis is on the description of realization of administrative building with operational warehouses in Brno. The thesis consists of report on construction and technology, study of the realization of the main technological stages, technical report on site technologies, technical report on wider transportation connections, proposal for the machinery assembly, time schedule, detailed budget, technological guidelines for rein-forced concrete ceiling, control and exam plan for reinforced concrete, report on safety and health protection on construction site, environmental requirements, and in lastly also comparisons of material of contact thermal insulation system, crane proposal, noise study. The thesis consist 15 annexes.
Reconstruction stores in Vyskov - construction technology project
Boček, Milan ; Nečasová, Barbora (referee) ; Biely, Boris (advisor)
This master´s thesis deals with a complete renovation of a shop in Vyškov. A part of this thesis represents a technical report of the worksite facilities, technological standard, inspection and test plan, machine design, plan of safety and protection of environment, contract for work, budget and schedule.
LD Seating production hall - construction technology project
Jůzl, Martin ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is a building-technological project on the production and assembly hall LD Seating in Boskovice u Brna. The solution is influenced by the existing hall in the area of the investor, where there will be a future new building. Based on this fact, the appropriate measures are chosen. The project puts emphasis on the off-road transport and the technological process of assembly of the prefabricated reinforced concrete hall, which will be solved from the financial and time point of view. The workflow will be affected by machine assembly, site facilities, and wider transport relationships. The project also solves the concept of the whole issue as a whole. All building objects are taken into account. Based on this, an object schedule and budget are developed.
Above-standard family house in Krelov - constructionally technological project
Ježowiczová, Barbora ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
Subject of this work is pursuance technology of above-standard family house. This diploma thesis contains construction and technology report, technological prescriptions for important parts of buildings, technology report of plant building site, concepts of mechanical assembly, inspection and test plan, technology report of health and safety on the construction site. Budget, calculation and time planning, a drawing of the facilities of the construction site, description of transport relations is included in addendum. Work also contains part about use of Calcium silicate masonry and its comparation.
Campus TRIANGL Uherske Hradiste - construction technology project
Chamrádová, Klára ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The subject of this thesis is a construction technology project Areal triangle in the town of. The work includes a technical report on the structural and technological project technical report construction site along with drawings of building equipment, technological prescription for the implementation process of monolithic structures, being associated inspection and test plan, as well as draft mechanical assemblies, technical report broader transport relations, including drawings, itemized budget calculation according THU and the timetable for construction. It also dealt with contract work, instructions for use of the building and assess two variants of cranes in economic terms. Also at work are chapters dealing with safety at work and environmental protection. More specifically, the work deals with one of the main buildings, namely the object SO10 - Building A. The construction is a reinforced concrete monolith on five floors. The work is mainly focused on the shell construction.
Koks production hall - upper stage of construction
Vaculík, Zdeněk ; Průcha, Aleš (referee) ; Biely, Boris (advisor)
Subject of this work is execution of the superstructure, especially solution of mounted frame included the lining together with the sheathing construction and building roof. The building will serve as assembly and storage hall for the Koks Production company. Reinforced concrete precast frame forms supporting structure. The building is split to two parts, single-storey hall and two-storey administration part. Construction-technological part from complete execution of the building rough superstructure has been selected as a bachelor’s thesis subject. The technological regulation for the assembly of reinforced concrete precast frame has been elaborated. The precast frame is formed by precast elements supplemented by the lining between the columns in the administration part. The solution of following subjects of building construction was taken into consideration too: • solution of suitable site machinery • workers health, safety, and preservation on the site • health protection • test and trial plan for the mounted reinforced concrete skeleton • time schedule and economic analysis for the superstructure • logistics and material storage on the site
Office building in Trencin - construction technology project
Panáček, Jakub ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The subject of my dissertation is to describe construction technology project of the administration building in Trencin. I focused on the budget, work schedule, environmental protection, appropriate setup of temporary objects on the construction site and efficient machine assembly. Result of work represents possible construction progression with focus on site condistions.
Apartment complex Netroufalky, building F - building technology project
Čermák, Jan ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for an apartment building in the Campus residential complex II, situated in Brno – Bohunice. Specifically, an apartment building (object F, designated SO 204) was selected, on which monolithic structures of the substructure will be solved. The content of the work is a technical report to the construction technology project, evaluation of transport routes, elaboration of technological regulations for selected technological stages, time schedule for the selected stage and partial detailed section of a typical floor. Furthermore, the construction site equipment with drawing and text part, control and test plan, itemized budget with bill of quantities, design of machine assemblies and work safety solutions are elaborated.
Storage hall No. 2 in Rousínov - construction-technological project
Gottvaldová, Denisa ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of my diploma thesis is a construction-technological solution for realization of a storage hall in Rousínov. The work deals with a time and financial plan for all buildings of the project Storage Hall, Rousínov. A technical report, a study of the implementation of the construction’s individual stages, a design and assessment of transport routes, a design of the construction site equipment and a design of the machinery were prepared for the building No. 2. An itemized budget with a statement of acreage and construction schedule was prepared. A technological regulation and a control and test plan were prepared for the implementation process of the wire-reinforced concrete industrial floor. Within the diploma thesis, a technological regulation for the implementation of a reinforced concrete retaining wall was prepared. Noise pollution caused by the construction site was examined and evaluated in a noise study. The environmental requirements for the storage hall building No. 2 were processed.

National Repository of Grey Literature : 244 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?