National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.
Pension Skalka-building and technological project
Patočka, Bronislav ; Štěrba, Martin (referee) ; Henková, Svatava (advisor)
This master´s thesis solves the building and technological project of a new guest house building in the village Skalka u Prostějova. It is a detached building made of brick masonry. The project contains the building of guest house and gabion retaining wall with parking place. Thesis is comprised of, inter alia, technological sketch of the main phases of building, time and financial plan, site facilities project, machinery proposal, budgets, technological rules and inspection and test plan.
Pension Skalka-building and technological project
Patočka, Bronislav ; Štěrba, Martin (referee) ; Henková, Svatava (advisor)
This master´s thesis solves the building and technological project of a new guest house building in the village Skalka u Prostějova. It is a detached building made of brick masonry. The project contains the building of guest house and gabion retaining wall with parking place. Thesis is comprised of, inter alia, technological sketch of the main phases of building, time and financial plan, site facilities project, machinery proposal, budgets, technological rules and inspection and test plan.
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.