National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Conceptual design of the reconstruction of an E.ON 22 kV distribution network installed at a specic area
Vepřek, Tomáš ; Nepevná, Vlastimila (referee) ; Blažek, Vladimír (advisor)
The aim of this thesis is a modification of the distribution network (DS) of the city of Brno to ensure power supply in the required quantity and quality for end consumers. Calculation of steady - state operation of distribution network (DS) of Brno is performed in the programme PAS DAISY Off-Line v.4.00 Bison. On the basis of available data (dispatching scheme, load current of stem lines and reserved power of wholesale customers) we will analyze the steady-state of network. We will find out which of the 110/22 kV transformer stations, cable and overhead lines are overloaded and perform network adjustments to ensure safe and reliable operation by 2015. We will identify in which year we will need to build a new power node in the northern part of Brno. The conclusion is focused on technical and economic evaluation of proposed alternative network arrangements.
Design of the expansion of 22 kV distribution network in a specific part of the city of Brno
Lakomý, Vojtěch ; Nepevná, Vlastimila (referee) ; Blažek, Vladimír (advisor)
The goal of this thesis is to design measures of the distribution network in Brno to ensure a supply of electricity to its consumers in required quantity, quality and reliability. This project will be solved in the program called PAS DAISY Off-Line v.4.00 Bizon. At first we make an analysis of the steady state of the distribution network. We check load of transformer stations 110/22 kV, overhead and cable lines if they operate in allowed limits. Then we complete or correct reserved power drains of big consumers of electricity in the model of distribution system. From the calculation of the steady state of the distribution network we will probably find out that some parts of the system are overloaded. Therefore we suggest changes for it (like switching over circuits, installation of new transformer stations and circuits), which should ensure safety and reliability of operations in the distribution system.
Conceptual design of the reconstruction of an E.ON 22 kV distribution network installed at a specic area
Vepřek, Tomáš ; Nepevná, Vlastimila (referee) ; Blažek, Vladimír (advisor)
The aim of this thesis is a modification of the distribution network (DS) of the city of Brno to ensure power supply in the required quantity and quality for end consumers. Calculation of steady - state operation of distribution network (DS) of Brno is performed in the programme PAS DAISY Off-Line v.4.00 Bison. On the basis of available data (dispatching scheme, load current of stem lines and reserved power of wholesale customers) we will analyze the steady-state of network. We will find out which of the 110/22 kV transformer stations, cable and overhead lines are overloaded and perform network adjustments to ensure safe and reliable operation by 2015. We will identify in which year we will need to build a new power node in the northern part of Brno. The conclusion is focused on technical and economic evaluation of proposed alternative network arrangements.
Design of the expansion of 22 kV distribution network in a specific part of the city of Brno
Lakomý, Vojtěch ; Nepevná, Vlastimila (referee) ; Blažek, Vladimír (advisor)
The goal of this thesis is to design measures of the distribution network in Brno to ensure a supply of electricity to its consumers in required quantity, quality and reliability. This project will be solved in the program called PAS DAISY Off-Line v.4.00 Bizon. At first we make an analysis of the steady state of the distribution network. We check load of transformer stations 110/22 kV, overhead and cable lines if they operate in allowed limits. Then we complete or correct reserved power drains of big consumers of electricity in the model of distribution system. From the calculation of the steady state of the distribution network we will probably find out that some parts of the system are overloaded. Therefore we suggest changes for it (like switching over circuits, installation of new transformer stations and circuits), which should ensure safety and reliability of operations in the distribution system.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.