National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Slavětice 110 kV switching station, during the period of 2011
Nábělek, Ondřej ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
In the Master Thesis discusses the impact of the bridge connecting the transformer to power system connection to a separate transformers. They were first analyzed the method of calculating the steady operation of the network using the Newton iterative method and the method of calculating short-circuit ratios. It describes the area Slavětice 110kV substation, which is the subject of subsequent calculations. It is also elucidating the function of the bridge connection, advantages and disadvantages. The reason for implementing the bridge operation is to increase the reliability of electricity supply to customers but the major disadvantage is the greater technical and economic performance because increased short circuit current and the need for transmission transformer 400/110kV same type with the same parameters. Point is the practical part, which contains already concrete results taken with the dispatcher software Sinaut. There is a short-circuit resistance compared to short-circuit power substation, then the burden of the elements (transformers, lines) for two specified connection alternatives and four interruptions important elements. Finally, it stated that it can be done with the bridge connection which technical measures. It was discovered that in terms of short-circuit ratios in the present time it is not possible to operate the bridge connection transformers substation Slavětice 110kV and in terms of very different parameters of transformers 400/110kV the operation is not recommended.
Photocell as a power source for a small DC motor of RC car model
Nábělek, Ondřej ; Huzlík, Rostislav (referee) ; Mikulčík, Aleš (advisor)
The goal of this project is to acquaint the reader with problems of solar cells and project of systems for solar cells power a small electric machine performance. Preliminary discussion of the energy produced by the Sun incident on the Earth. Another chapter contains information about the fundamental function of solar silicon cells and conversion of solar energy to electric energy. Main part of this work is devoted to various types of solar cells, production materials, the structure of cells and solar panel. The last part is a measurement system for solar cells, the verification of theoretical assumptions and evaluate the results of the work.
Photocell as a power source for a small DC motor of RC car model
Nábělek, Ondřej ; Huzlík, Rostislav (referee) ; Mikulčík, Aleš (advisor)
The goal of this project is to acquaint the reader with problems of solar cells and project of systems for solar cells power a small electric machine performance. Preliminary discussion of the energy produced by the Sun incident on the Earth. Another chapter contains information about the fundamental function of solar silicon cells and conversion of solar energy to electric energy. Main part of this work is devoted to various types of solar cells, production materials, the structure of cells and solar panel. The last part is a measurement system for solar cells, the verification of theoretical assumptions and evaluate the results of the work.
Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Slavětice 110 kV switching station, during the period of 2011
Nábělek, Ondřej ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
In the Master Thesis discusses the impact of the bridge connecting the transformer to power system connection to a separate transformers. They were first analyzed the method of calculating the steady operation of the network using the Newton iterative method and the method of calculating short-circuit ratios. It describes the area Slavětice 110kV substation, which is the subject of subsequent calculations. It is also elucidating the function of the bridge connection, advantages and disadvantages. The reason for implementing the bridge operation is to increase the reliability of electricity supply to customers but the major disadvantage is the greater technical and economic performance because increased short circuit current and the need for transmission transformer 400/110kV same type with the same parameters. Point is the practical part, which contains already concrete results taken with the dispatcher software Sinaut. There is a short-circuit resistance compared to short-circuit power substation, then the burden of the elements (transformers, lines) for two specified connection alternatives and four interruptions important elements. Finally, it stated that it can be done with the bridge connection which technical measures. It was discovered that in terms of short-circuit ratios in the present time it is not possible to operate the bridge connection transformers substation Slavětice 110kV and in terms of very different parameters of transformers 400/110kV the operation is not recommended.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.