National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
The second phase shifting I/9 Dubice - Dolni Libchava
Belda, Miroslav ; Jíra, Daniel (referee) ; Kosňovský, Michal (advisor)
Master's thesis will deal with the second phase of shifting I/9 Dubice - Dolni Libchava passing west of the Ceska Lipa with an approximate length of 3 km stretch. Estimated start-up of this section is in 2014. This project should build on in the future by-pass Ceska Lipa and Novy Bor, which is currently without funds for implementation by 2025. Traffic load after completion of the by-pass should be approximately 16500 vehicles / 24 hours in 2030. The section is designed in the category S 9.5 with optional solving two major intersections. This thesis will focus on reducing the cost of construction of the section.
The second phase shifting I/9 Dubice - Dolni Libchava
Belda, Miroslav ; Jíra, Daniel (referee) ; Kosňovský, Michal (advisor)
Master's thesis will deal with the second phase of shifting I/9 Dubice - Dolni Libchava passing west of the Ceska Lipa with an approximate length of 3 km stretch. Estimated start-up of this section is in 2014. This project should build on in the future by-pass Ceska Lipa and Novy Bor, which is currently without funds for implementation by 2025. Traffic load after completion of the by-pass should be approximately 16500 vehicles / 24 hours in 2030. The section is designed in the category S 9.5 with optional solving two major intersections. This thesis will focus on reducing the cost of construction of the section.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.