National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
Ventilation of Cultural Centre
Hodula, Jakub ; Uher, Pavel (referee) ; Rubinová, Olga (advisor)
This thesis describes the design of ventilation for the cultural center, located in Prague 6 - Dejvice. The center consists of entrance hall, restaurant, conference room, sanitary facilities, restaurant facilities, facilities for performers and from the main hall with a vestibule. I solved the zone in detail the main hall and vestibule zone of sanitary facilities in the first basement floor. The main hall is air-conditioned vestibule with central air-conditioning equipment. Sanitary hot air is ventilated with air-conditioning equipment installed under the ceiling structure. The vestibule is partially air-conditioned central air handling units and fan coils partially located in the lower ceiling. Hall capacity is 173 persons and 68 persons foyer. The cooling source is a block unit. In winter, the hall, lobby and sanitary hot air ventilation. The building is heated with central heating converters in the hall and vestibule with radiator in hygienic facilities. In the theoretical part of the topic I worked in air distribution components, where I discussed the types of distribution of elements, their location and distribution of the type and scope of the current.
Ventilation of Cultural Centre
Hodula, Jakub ; Uher, Pavel (referee) ; Rubinová, Olga (advisor)
This thesis describes the design of ventilation for the cultural center, located in Prague 6 - Dejvice. The center consists of entrance hall, restaurant, conference room, sanitary facilities, restaurant facilities, facilities for performers and from the main hall with a vestibule. I solved the zone in detail the main hall and vestibule zone of sanitary facilities in the first basement floor. The main hall is air-conditioned vestibule with central air-conditioning equipment. Sanitary hot air is ventilated with air-conditioning equipment installed under the ceiling structure. The vestibule is partially air-conditioned central air handling units and fan coils partially located in the lower ceiling. Hall capacity is 173 persons and 68 persons foyer. The cooling source is a block unit. In winter, the hall, lobby and sanitary hot air ventilation. The building is heated with central heating converters in the hall and vestibule with radiator in hygienic facilities. In the theoretical part of the topic I worked in air distribution components, where I discussed the types of distribution of elements, their location and distribution of the type and scope of the current.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.