National Repository of Grey Literature 11 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Study of the Modernization of the Railway Line Suchdol nad Odrou – Budisov nad Budisovkou
Zwrtková, Kateřina ; Guziur, Petr (referee) ; Říha, Tomáš (advisor)
The goal of the thesis was to propose modifications to the existing railway track that would meet the requirements for the specified travel time, through its design, allow the placement of the train station in Budišov closer to the city center. The modifications were carried out in several variants, from which the most optimal one was selected and further developed.
Design Concept of Chrudim - Borohradek Railway Track Reconstruction (section between km 35.000 and km 38.621) with Technological Procedure of Works
Marek, Josef ; Guziur, Petr (referee) ; Valehrach, Jan (advisor)
The objective of this bachelor’s thesis was to design the optimization of the geometric parameters of railway track Chrudim – Borohrádek in km 35,000 – 38,621. Reconstruction of the railway superstructure and the design of the track drainage renewal was done. The bachelor’s thesis also deals with the view conditions at the crossings. A solution to the work technological procedure is included.
Route Study of the Direct Connection between Ostrava-Trebovice and Hlucin
Gilligová, Kristýna ; Guziur, Petr (referee) ; Říha, Tomáš (advisor)
The goal of this project was to design a new railroad between the train stations Ostrava-Třebovice and Hlučín. This section of the railroad was first designed in multiple variants. The best variant was then chosen and worked on in detail in the formo f a study. The chosen variant was designed for the speed of 80 km/h. The lenght of this section is nearly 5,5 km.
Methodology for designing the dead end tracks
Guziur, Petr ; Týfa,, Lukáš (referee) ; Kohout,, Martin (referee) ; Svoboda, Richard (advisor)
This work aim is designing of dead-end tracks with focus mainly on the friction buffer stop design. There are numerous factors in decision-making process of ending the dead-end track, such as position of the track in station, level of train control system, area capabilities, number and types of trains that regularly run on the track, etc. The recherche part of this work shows that friction buffer stop is the most suitable construction and preferred type of ending the dead-end track abroad. This is the reason for paying attention to that type of buffer stop with emphasis on the process of design itself. This work includes design of a program using a spreadsheet editor and Visual basic to make the design of friction buffer stop easier. There are described selected factors with highest impact on the design.
Upgrading of Brno-Slatina Railway Station
Guziur, Petr ; Andratschke, Jan (referee) ; Svoboda, Richard (advisor)
The subject of the master´s thesis is to design a reconstruction of the Brno - Slatina railway station to provide three edges of platforms that meet current requirements. Design make possible to insert one island platform and one outside platform that meet the requirements for access for persons with reduced orientation and mobility. Reconstruction will increase speed on main tracks, from the existing 80 km/h, to 100 km/h
Optimisation of the track section Nýřany - Heřmanova Huť km 2,7 - 5,5
Nguyen, Trong Tan ; Guziur, Petr (referee) ; Dušek, Erik (advisor)
The aim of this thesis is optimizing of the single track line no. 712 Nýřany-Heřmanova Huť in the track section between km 2,7-5,5. The thesis includes modifications of the profile and alignment of the line which aim to raising of the track speed. The thesis also deals with track geometry adjustment, railway superstructure and railway substructure reconstruction, track drainage renewal and level crossings and platforms reconstruction.
Route Study of the Direct Connection between Ostrava-Trebovice and Hlucin
Gilligová, Kristýna ; Guziur, Petr (referee) ; Říha, Tomáš (advisor)
The goal of this project was to design a new railroad between the train stations Ostrava-Třebovice and Hlučín. This section of the railroad was first designed in multiple variants. The best variant was then chosen and worked on in detail in the formo f a study. The chosen variant was designed for the speed of 80 km/h. The lenght of this section is nearly 5,5 km.
Methodology for designing the dead end tracks
Guziur, Petr ; Týfa,, Lukáš (referee) ; Kohout,, Martin (referee) ; Svoboda, Richard (advisor)
This work aim is designing of dead-end tracks with focus mainly on the friction buffer stop design. There are numerous factors in decision-making process of ending the dead-end track, such as position of the track in station, level of train control system, area capabilities, number and types of trains that regularly run on the track, etc. The recherche part of this work shows that friction buffer stop is the most suitable construction and preferred type of ending the dead-end track abroad. This is the reason for paying attention to that type of buffer stop with emphasis on the process of design itself. This work includes design of a program using a spreadsheet editor and Visual basic to make the design of friction buffer stop easier. There are described selected factors with highest impact on the design.
Optimisation of the track section Nýřany - Heřmanova Huť km 2,7 - 5,5
Nguyen, Trong Tan ; Guziur, Petr (referee) ; Dušek, Erik (advisor)
The aim of this thesis is optimizing of the single track line no. 712 Nýřany-Heřmanova Huť in the track section between km 2,7-5,5. The thesis includes modifications of the profile and alignment of the line which aim to raising of the track speed. The thesis also deals with track geometry adjustment, railway superstructure and railway substructure reconstruction, track drainage renewal and level crossings and platforms reconstruction.
Design Concept of Chrudim - Borohradek Railway Track Reconstruction (section between km 35.000 and km 38.621) with Technological Procedure of Works
Marek, Josef ; Guziur, Petr (referee) ; Valehrach, Jan (advisor)
The objective of this bachelor’s thesis was to design the optimization of the geometric parameters of railway track Chrudim – Borohrádek in km 35,000 – 38,621. Reconstruction of the railway superstructure and the design of the track drainage renewal was done. The bachelor’s thesis also deals with the view conditions at the crossings. A solution to the work technological procedure is included.

National Repository of Grey Literature : 11 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.