|
Selecting Objects in Augmented Reality
Pribylina, Martin ; Materna, Zdeněk (referee) ; Kapinus, Michal (advisor)
This work proposes and tests methods for object selection in augmented reality. The work focuses on selecting objects that overlap with each other in densely populated clusters. The proposed selection methods are direct selection, cursor, and list. As part of the work, an application has been developed that allows testing of the three methods and measures accuracy, time, motion and other criteria for a thorough evaluation of their applicability. The application was implemented using Unity and ARCore. A user study with 16 respondents was conducted using the test application. The results of the work show the advantages and disadvantages of each selection.
|
|
Department store - Building Technology Project
Bláhová, Barbora ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
The thesis is focused on building technology solutions for the construction department store. The front of the main entrance, designed for base personnel has two floors; the rest designed for the sale is single-storey. The building is designed as a reinforced concrete skeleton hall. Roofing is solved by a flat roof consisting of sales of reinforced concrete beams with a slope of 3 %, with the roofing sheet ALKORPLAN. The two-storey part of the roof is again dealt with a flat roof, consisting of ceiling panels and concrete catchment slope of 2 %, the roofing sheet ALKORPLAN. External walls are designed sandwich panels KINGSPAN. Walls and ceilings are dealt with plasterboard. The floors are made of linoleum and ceramic tiles. The building is equipped with aluminum windows, interior doors are made of wood. Outdoor and entrance doors are made from aluminum. This thesis addresses the implementation of technology, organization of construction, time demands, costs to implement the object, control over the implementation – KZP, coordination situation, and instructions for use of the building after its handover to the owner.
|
|
Time requirement of building construction
Kašiár, Dominik ; Výskala, Miloslav (referee) ; Aigel, Petr (advisor)
The subject of this (bachelor) work is to identify the factors influenced the time demandingness of building construction. Design and project companies have provided me as many similar disposition objects (buildings) as possible to determine the time demandingness of building construction. I have sellected non-cellar bungalows.
|
| |
|
Time requirement of building construction
Kašiár, Dominik ; Výskala, Miloslav (referee) ; Aigel, Petr (advisor)
The subject of this (bachelor) work is to identify the factors influenced the time demandingness of building construction. Design and project companies have provided me as many similar disposition objects (buildings) as possible to determine the time demandingness of building construction. I have sellected non-cellar bungalows.
|
|
Department store - Building Technology Project
Bláhová, Barbora ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
The thesis is focused on building technology solutions for the construction department store. The front of the main entrance, designed for base personnel has two floors; the rest designed for the sale is single-storey. The building is designed as a reinforced concrete skeleton hall. Roofing is solved by a flat roof consisting of sales of reinforced concrete beams with a slope of 3 %, with the roofing sheet ALKORPLAN. The two-storey part of the roof is again dealt with a flat roof, consisting of ceiling panels and concrete catchment slope of 2 %, the roofing sheet ALKORPLAN. External walls are designed sandwich panels KINGSPAN. Walls and ceilings are dealt with plasterboard. The floors are made of linoleum and ceramic tiles. The building is equipped with aluminum windows, interior doors are made of wood. Outdoor and entrance doors are made from aluminum. This thesis addresses the implementation of technology, organization of construction, time demands, costs to implement the object, control over the implementation – KZP, coordination situation, and instructions for use of the building after its handover to the owner.
|
| |