National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Production buildings, Production of aquariums in Brno
Starý, Tadeáš ; Klement, Miloš (referee) ; Boleslavská, Yvona (advisor) ; Bečkovský, David (advisor)
The aim of this bachelor thesis was designing a new industrial object and creating structural part of design documentation for a production hall in Brno Horní-Heršpice. This object is based on a architectural study made as part of subject AG035. Horní Heršpice is a city district located at southern side of Brno. At the plot there are few small buildings in desolate conditions, which are intended for demolition. Car service building in the eastern side of plot is preserved in my design. Architectural conception was to creace three graduating masses. Every mass has its own internal function – administrative building, production hall with a crane and production hall with storage facilities. Toghether they create one functional unit. From office hall emerges glazed exhibition space. Its load-bearing structure is made of subtle glass beams. This space represents aquarium. Skeletal structural system is made from precast concrete elements. For facade are used white sandwich facade panels. Roof panels at halls create gable roof. Administrative building has green terrace. To break the symmetry is used polygonal water feature. Above the water there is glass artwork and pier. Object is meant to represent company akvária-Pavlica with its elegance, minimalism and present technologies, used to create aquariums, in structural details.
Production of aquariums Brno Pavlica
Čadová, Veronika ; Vostrejž, Dušan (referee) ; Boleslavská, Yvona (advisor) ; Bečkovský, David (advisor)
The topic of the bachelor thesis is a design of an industrial building for the Akvária Pavlica company. The design deals with documentation for obtaining a building permit and documentation of construction. The project is based on a previously developed architectural study for the subject AG035 and contruction study for the subject AG036. The assigned building parcel is located in the west part of Brno Horní Heršpice and slopes slightly to the north side. The parcel is situated near the local road of the Sokolova street. The main access to the parcel is also from the same street. The layout design of the plot contains a parking lot for employees and visitors, an seperated area for trucks and a garden area. At the moment the parcel mostly fits into the brownfields. The design of the new building consists of 3 functional units - exhibition space/showroom, facilities for administration and production space. The basic idea was to separate the units for the public from employees and vice versa. For this reason, the production and exhibition unit is located in "stand-alone" functioning units. The administration is located on them as the 2nd floor. That creates a walk - through area to the garden and the main entrance to the building. The construction system is a steel frame structure based on the reinforced concrete step footing foundations covered by flat and sloped roofs. The steel frame structure is supplemented by Ytong blocks. The Trimoterm vertical panels are used throughout the building as a facade covering. The mainly used materials for construction are steel, glass, concrete and metal. The main aim of the design was to create a well-functioning spatially separated but overall compact space, which will ensure both quality product production, as well as a pleasant working space for employees and a functional space for public visitors.
Production buildings, Production of aquariums in Brno
Starý, Tadeáš ; Klement, Miloš (referee) ; Boleslavská, Yvona (advisor) ; Bečkovský, David (advisor)
The aim of this bachelor thesis was designing a new industrial object and creating structural part of design documentation for a production hall in Brno Horní-Heršpice. This object is based on a architectural study made as part of subject AG035. Horní Heršpice is a city district located at southern side of Brno. At the plot there are few small buildings in desolate conditions, which are intended for demolition. Car service building in the eastern side of plot is preserved in my design. Architectural conception was to creace three graduating masses. Every mass has its own internal function – administrative building, production hall with a crane and production hall with storage facilities. Toghether they create one functional unit. From office hall emerges glazed exhibition space. Its load-bearing structure is made of subtle glass beams. This space represents aquarium. Skeletal structural system is made from precast concrete elements. For facade are used white sandwich facade panels. Roof panels at halls create gable roof. Administrative building has green terrace. To break the symmetry is used polygonal water feature. Above the water there is glass artwork and pier. Object is meant to represent company akvária-Pavlica with its elegance, minimalism and present technologies, used to create aquariums, in structural details.
Production of aquariums Brno Pavlica
Čadová, Veronika ; Vostrejž, Dušan (referee) ; Boleslavská, Yvona (advisor) ; Bečkovský, David (advisor)
The topic of the bachelor thesis is a design of an industrial building for the Akvária Pavlica company. The design deals with documentation for obtaining a building permit and documentation of construction. The project is based on a previously developed architectural study for the subject AG035 and contruction study for the subject AG036. The assigned building parcel is located in the west part of Brno Horní Heršpice and slopes slightly to the north side. The parcel is situated near the local road of the Sokolova street. The main access to the parcel is also from the same street. The layout design of the plot contains a parking lot for employees and visitors, an seperated area for trucks and a garden area. At the moment the parcel mostly fits into the brownfields. The design of the new building consists of 3 functional units - exhibition space/showroom, facilities for administration and production space. The basic idea was to separate the units for the public from employees and vice versa. For this reason, the production and exhibition unit is located in "stand-alone" functioning units. The administration is located on them as the 2nd floor. That creates a walk - through area to the garden and the main entrance to the building. The construction system is a steel frame structure based on the reinforced concrete step footing foundations covered by flat and sloped roofs. The steel frame structure is supplemented by Ytong blocks. The Trimoterm vertical panels are used throughout the building as a facade covering. The mainly used materials for construction are steel, glass, concrete and metal. The main aim of the design was to create a well-functioning spatially separated but overall compact space, which will ensure both quality product production, as well as a pleasant working space for employees and a functional space for public visitors.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.