National Repository of Grey Literature 13 records found  previous11 - 13  jump to record: Search took 0.01 seconds. 
Air conditioning of the cinema
Czempka, David ; Rubinová, Olga (referee) ; Blasinski, Petr (advisor)
The aim of this bachelor thesis was to design air-conditioning systems in the selected cinema equipped with a spacious foyer with bar, cinema hall with technical facilities, recording studio and secondary spaces. Systems are designed to meet hygienic, operational and safety requirements and to create an optimal indoor microclimate for people. The air-conditioning systems provide distribution of fresh air and extract of exhaust air, covering the heat loss in winter and heat gains in summer, and in selected spaces also humidification in the winter season. In the theoretical part of the thesis, I focused on the basic acoustic quantities and spatial acoustics.
Airconditioning for multistorey detached house
Tupcová, Tereza ; Blasinski, Petr (referee) ; Rubina, Aleš (advisor)
The bachelor’s thesis deals with design of airconditioning systems for living rooms in multistorey detached house. The design is made to fullfill functional, hygienic and operational ruqirements for the microclimate of interier. The main task of airconditioning systems is to cover heat losses in the winter, heat gains in the summer and intake of requirement minimum of fresh air. The theoretical part deals with acoustics, mainly with sound transmition and possibilities of reduction sound intensity in rational way or by physical-technical device. The practical part includes design of two airconditioning systems of hot air rating and climatization for detached house. The result of the work is the implementing documentation of two airconditioning systems for the object.
Air condition of bank
Josef, Michal ; Rubinová, Olga (referee) ; Uher, Pavel (advisor)
This work is focused on designing an air conditionning system for bank so as to meet functional, hygienic, architectural and operational requirements for microclimate of officer building. The main tasks of the device are covering heat gain of area of the bank in the summer and transportation of fresh air into the room. The system is also designed to cover the winter heat gains. The theoretical part is about the production of cold water for cooling buldings and the practical part contains two desings of ventilation and air conditioning system for bank. The result of this work is detailed design work for two air conditioning equipments for specified object.

National Repository of Grey Literature : 13 records found   previous11 - 13  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.