National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Bridge structure over the valley
Hroudná, Denisa ; Kostka, Vojtěch (referee) ; Koláček, Jan (advisor)
The subject of this diploma thesis is the design of post-tensioned road bridge over the valley. Two preliminary studies have been proposed and one of them was selected for more detailed processing. The selected variant is a box girder with a constant height 2,5 m. The construction id divided into five span and its total lenght is 240 m Span length of construction is 18,0 m. The construction was assessed for ultimate and serviceability limit state acording to standarts and regulation. Drawings and vizualizations ard parts of the diploma thesis.
Prestressed bridge over the Budišovka river
Hroudná, Denisa ; Zich, Miloš (referee) ; Koláček, Jan (advisor)
The subject of this bachelor's thesis is the design of a prestressed bridge over the river Budišovka. Three preliminary studies have been proposed and one of them was selected for more detailed processing. Span length of construction is 18,0 m. Selected variant was assessed for ultimate and serviceability limit state according to CSN EN 1992-2.
Bridge structure over the valley
Hroudná, Denisa ; Kostka, Vojtěch (referee) ; Koláček, Jan (advisor)
The subject of this diploma thesis is the design of post-tensioned road bridge over the valley. Two preliminary studies have been proposed and one of them was selected for more detailed processing. The selected variant is a box girder with a constant height 2,5 m. The construction id divided into five span and its total lenght is 240 m Span length of construction is 18,0 m. The construction was assessed for ultimate and serviceability limit state acording to standarts and regulation. Drawings and vizualizations ard parts of the diploma thesis.
Prestressed bridge over the Budišovka river
Hroudná, Denisa ; Zich, Miloš (referee) ; Koláček, Jan (advisor)
The subject of this bachelor's thesis is the design of a prestressed bridge over the river Budišovka. Three preliminary studies have been proposed and one of them was selected for more detailed processing. Span length of construction is 18,0 m. Selected variant was assessed for ultimate and serviceability limit state according to CSN EN 1992-2.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.