Technological stage of the rough construction of the residential building in Bratislava
Krajčovič, Matúš ; Novotný, Michal (referee) ; Doubek, Rostislav (advisor)
The subject of my bachelor thesis is the processing of the structural work of tower structure. The construction is based on piles and foundation plate. The thesis presents the construction solutions from the perspective of construction technology. Part of the work is an accompanying and summary technical report, site drawing and site equipment, broader traffic route relations, timetable, itemized budget, work list with quantities, machine assembly, technological regulation for the monolithic construction – waterproof concrete construction, safety and protection at work, field research of cranes.
Technological stage of the substructure of a residential building in Trutnov
Bonaventura, Pavel ; Bříza, Lukáš (referee) ; Kantová, Radka (advisor)
The bachelor's thesis aimed to prepare the stage of implementation of the rough lower construction of the apartment building which is located in Trutnov. The block of flats is based on a grade construction made of concrete strips footing and construction blocks of pernament formwork. Technological regulations have been created for the stage of realization of the rough lower construction, the equipment of the construction site have been suggested, appropriate machine set has been chosen, shipping relations for material and machine supplies have been considered, OHS (occupational safety and health), control and trial plan have been applied as well as a schedule and budget were created.
Public library
Kavečková, Hana ; Jelínek, Petr (referee) ; Struhala, Karel (advisor)
The Thesis deals with a design and project documentation for the public library in Ivanovice na Hané. The construction was designed as the four-floor object with a partial cellar. The ground plan creates a rectangle. The object is roofed with a warm deck flat roof. In the basement, an archive area and a utility room prevail. On the first floor of above-ground, there is a space for public and employees. In the separated area, the Confectionery equipped with own sanitary facility for customers and employees is located. There is a spacious entry hall with the access to individual floors. On the second floor, the free library and the children´s department are situated including a lecture hall with own facilities above the Confectionery. On the third floor, there are the library headquarters and the reading area. You can find the sanitary facilities for public on each floor. The object structure is made of a monolithic reinforced concrete skeleton filled with the masonry from acoustic ceramic tiles on the above-grounded floors. In the basement, the structure is created by reinforced concrete walls and walls from the formwork. The ceiling is made of reinforced concrete prestressed panels. The object is based on the ground slabs. In the area of lift shafts, the structure is from the reinforced concrete slab. The walls in the basement are insulated with the XPS polystyrene; in the above-ground area by mineral wood boards and ventilated facades.
Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré Město
Seménka, Petr ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.
Construction Technology Project of the extension of the Medical Faculty in Prague
Januška, Marek ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The goal of this diploma thesis is the processing of the building-technological project for Health University in Prague. For the thesis there was elaborated a technic report, situation of the construction place, object time schdule and financial plan, the study of the implementation of technologist. Stages, project of construction site equipment, design of mechanical assembly, technological regulation for the implementation of monolithic vertical and horizontal load-bearing structures together with inspection and test plan. Furthermore, the thesis contains a schedule of the main building, a plan for securing material resources and a financial analysis of the formwork. The basis for preparation thesis is the project documentation of the construction.
Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horou
Hořínková, Dita ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.
Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
Selected parts of the construction-technology plan - kindergarten in Brno
Bartek, Petr ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
This thesis deals with a construction-technology plan of two-story nursery school in Brno, district Bystrc. Thesis contains engineering report, financial and time schedule for structures, project of construction site, noise study, technological notes and inspection and test plans for cast-in-place reinforced concrete slabs and for prestressed concrete Spiroll floor slabs, formwork study, list of main machines used during construction, time schedule, needed quantity of workers and itemized budged for carcass, budged for whole building and comparison of cranes. Moreover, in appendices are drawings of approaches and processes during construction in its different phases.
Preparation of realization of the monolithic skeleton of the Třebíč hospital surgery pavilion
Hlávka, Jan ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this thesis is to process the technological stage of the upper gross construction of the hospital pavilion in Třebíč. The building is designed to provide medical care and amenities. It is mainly an underground construction with one underground and five above-ground floors. The main structural constructions are monolithic skeleton supplemented with reinforcing walls and cores. The cladding is lined with brick blocks Porotherm. The subject of the processed technological stages is the solution of monolithic reinforced concrete vertical and horizontal supporting structures. Within the framework of another assignment, proposals for protection against monolithic reinforced concrete structures and protection against leased radiation are processed.
Technological Solution of a Gross Superstructure of the Apartment Building in Complex Ponava City, Brno
Handlíř, Jan ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The subject of the bachelor thesis is tegnological construction project of a gross superstructure of the apartment building in a complex Ponava city in Brno. The building is seven-storey and has a basement. Vertical walls are partly from masonry and partly from reinforced concreate. The ceilings are from reinforced concrete and the building has a flat roof. The thesis includes a technical report, technological methods of construction, technical report of a site equipment, machine draft report, inspection and test plan, work safety and comparing different materials of vertical walls.