Leveling measurements at newly stabilized height points in Dětmarovice Regional Center in 2017
Kajzar, Vlastimil ; Waclawik, Petr ; Staš, Lubomír
In the northern area of the mining quarters Doubrava and Karviná Doly I, the mining works are carried out at the boundary of the Dětmarovice and Doubrava Regional Authority. For this reason, the points in this area are stabilized on a regular basis twice a year in order to determine possible mine effects on surface and surface objects. Since 2014, the Institute of Geonics ASCR, v.v.i., Ostrava has been chosen as the contractor of these works. The results of the measurements are presented every year in the Final Report - Elevation Measurements in the Northern Area of Mining Doubrava and Karviná Mines I.
Final Report - Rating of the deformation stress monitoring the state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor-a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Ptáček, Jiří ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report V/2016 (Waclawik et al. 2016). Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.
Partial Report V/2017 - Rating of the deformation stress monitoring the state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor-a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report IV/2016 (Waclawik et al. 2016) passed buyers in April this year. Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.\n
Fulltext: Download fulltextPDF
Parametric study of usability of selected surveying equipment for monitoring of mine workings stability in undermined areas
Kajzar, Vlastimil ; Kukutsch, Radovan ; Koníček, Petr ; Waclawik, Petr ; Šňupárek, Richard
Although the deformation measurements are in mining practice routine activities, the development of information and surveying technology shows, that it is possible to approach this problematics in a new way. One of the options is the application of terrestrial 3D laser scanning technology, which can be successfully used both for purposes of monitoring - deformations of objects on undermined area and mine workings at all.\nSubmited parametric study presents the use of laser technology in the research activities of the Institute of Geonics, v.v.i., within the ICT-PU project. This study deals with technical and theoretical aspects of laser scanning, which verification in situ has been a precondition for the subsequent successful application of this technology both on the surface and in the mining environment. The main scope of the study is dedicated to the deployment of selected technology in solving specific tasks. In the undermined areas were achieved knowledge used in solving the problems of monitoring the stability of slopes and rock faces of mining chasm. In the underground mine workings, this technology has been successfully deployed for the purposes of the spatial deformation monitoring of selected longwall corridor at mine Karvina and also for the long-term monitoring of coal pillars in Room and Pillar pilot project at ČSM coal mine.\nAt the end of a parametric study is special space devoted to the limiting factors of 3D laser scanning and also to the summary of best practices of scanning in such highly exposed conditions.\n
Fulltext: content.csg - Download fulltextPDF
Plný tet: UGN_0472640 - Download fulltextPDF
Height measurement in the northern area of mining areas Doubrava and Karviná Mines In 2016
Kajzar, Vlastimil ; Waclawik, Petr ; Staš, Lubomír
In the northern area of ​​mining areas Doubrava and Karvina mines on the border RA Detmarovice and Doubrava are implemented, the mining activities. For this reason, in order to detect possible effects of the mine to the surface and surface objects twice a year height focuses, points in this area stable. From 2014 he was a contractor for these works chosen by the Institute of Geonics, v.v.i., Ostrava. In August and November 2016 survey conducted campaigns planned this year, during which it conducted a total of 4 highrise focus of inter-related leveling routes, which are formed by these points. Highrise points are stabilized in the area of ​​interest in several ways - usually in steel design height marks on buildings, then as an iron bolt concreted in the ground or using nails driven into the concrete foundation or other alternative means. Distribution points in the area of ​​interest is indicative captured in the map appendix. Existing trace and focus points are highlighted in green, yellow trace inaccessible points, refocused points in red and violet points that have occurred to their long term disablement or destruction. Each zaměřovaných points in order to trace the terrain carefully documented (GPS coordinates, photos, text description) and registered. These documents are available from the contractor.
The leveling of the newly stabilized elevation points in RA Detmarovice in 2016
Kajzar, Vlastimil ; Waclawik, Petr ; Staš, Lubomír
In the northern area of mining areas Doubrava and Karvina mines on the border RA Detmarovice and Doubrava are implemented, the mining activities. For this reason, in order to detect possible effects of the mine to the surface and surface objects twice a year height focuses, points in this area stable. From 2014 he was a contractor for these works chosen by the Institute of Geonics, v.v.i., Ostrava. The measurement results are annually presented in the final report - elevation measurements in the northern area of mining areas Doubrava and Karviná Mines I. In 2016, the existing network of height points in a cadastral municipality Dětmarovice expanded by 11 new points. New points are stabilized by means of steel bench mark on objects. Elevation point near house No. 713 is a stabilized form of measuring support cast-in steel casing
Partial Report IV / 2016 - Rating of the deformation stress monitoring the state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor - a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Ptáček, Jiří ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Koníček, Petr ; Souček, Kamil ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report III / 2015 (Waclawik et al. 2015) passed buyers in April this year. Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.
Fulltext: content.csg - Download fulltextPDF
Plný tet: UGN_0464907 - Download fulltextPDF
The study of the influence of the single entry and pillar mining method in seam No. 40 in Jan-Karel protective shaft pillar, location CSA Mining Plant 1 on Jan and shaft No. 2 downcast shafts and on the CSA 3 upcast air shaft, surface and surface objects
Ptáček, Jiří ; Kajzar, Vlastimil ; Koníček, Petr ; Kukutsch, Radovan ; Waclawik, Petr ; Jiránková, E.
The presented method single entry room and pillar solves the possibility of applying single entry room and pillar mining method, where roadheaders are used, newly in two variants. According to the first of them will be entries and intra-entries inundated with a time lag with fly ash mixtures. The second variant will be excavated only basic entries with a width of 6.8 meters. They will not be flooded. The purpose of the study is also adding calculations of potential and the expected impact of single entry room and pillar method on the surface and surface objects and also the expected impact on the shafts in Jan-Karel protective shaft pillar.
Monitoring project of the deformation stress state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor - a pillar in OPJ ČSM - NORTH - Quarrying II
Waclawik, Petr ; Koníček, Petr ; Ptáček, Jiří
This is a project monitoring of the deformation stress state of the rock mass during mining decant no. 30 (634) within the trial operation of new methods corridor - a pillar in the protective pillars jam CSM Mine, site Sever
Partial Report III / 2015 - Rating of the deformation stress monitoring state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor - a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Ptáček, Jiří ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Koníček, Petr ; Souček, Kamil ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report II / 2015 (Waclawik et al. 2015) passed buyers in April this year. Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.

National Repository of Grey Literature : 66 records found   beginprevious34 - 43nextend  jump to record:
See also: similar author names
1 Waclawik, P.
Interested in being notified about new results for this query?
Subscribe to the RSS feed.