National Repository of Grey Literature 145 records found  1 - 10nextend  jump to record: Search took 0.02 seconds. 
Extension of the secondary school in Brno - the technological stage of the implementation of the monolithic reinforced concrete skeleton of the rough superstructure
Slavíková, Kateřina ; Vlčková, Jitka Laura (referee) ; Diaz, Yvetta (advisor)
The subject of the bachelor's thesis is the technological stage of the implementation of the monolithic reinforced concrete skeleton of the extension of the secondary school in Brno, Charbulova. Included is the processing of the work procedure and the design of the formwork assembly. Furthermore, the work deals with the design of the machine assembly, the equipment of the construction site, transport relations in the vicinity of the construction site and the overall organisation of the construction. A time schedule and itemised budget were prepared for the given technological stage. The work also deals with quality assurance, safety and health protection at work.
Villa Park Olomouc, technological stage of the substructure
Hanousková, Lucie ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor's thesis is processed on the basis of the project documentation provided, which addresses the construction of nine apartment buildings connected by an underground garage. The building is located in the new residential development VilaPark Tabulový Vrch, which represents a set of three-storey villas. The houses are based on pilots carried out by continuous spiral worm - CFA technology. The pilots are joined by a subterranean concrete structure made of water-based concrete, and above ground they form a monolithic structure combined with masonry. The roof is designed as a flat, non-errand. The cladding of the buildings is done by the contact cladding system ETICS. The work addresses the technological stage of the lower construction. A technical report is prepared, the construction situation with wider links of transport routes, technological regulations for earthworks and piloting by cfa method, the design of a machine assembly for the whole lower structure, control and test plans for earthworks and piloting and safety of work. The work also includes an acreage statement, an appropriations budget, a time plan for the construction and the organization of the construction for the lower construction with the construction site equipment and balance of resources.
Preparation for the implementation of a sports hall at the elementary school in Rajhrad
Kryštof, Filip ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The subject of my diploma thesis is preparation for the implementation of sports hall at the elementary school in Rajhrad. The aim of this thesis is to elaborate construction technology plan for the main building marked SO.01 – Sports hall, focusing on time management, technology, and resources of implementation. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, technological regulations, inspection and testing plan for the implementation of precast concrete frame. Also elaborated are calculation of construction according to THU, an occupational health and safety plan, a noise study and comparative study for a lifting mechanism.
Apartment building on Tišnov - construction technology project
Zemánek, Petr ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The diploma thesis is devoted to the construction technology project of the foundation construction part of the Tišnov - Mlýnská Apartment Building (SO 01). The diploma deals in detail with the special foundation and monolithic construction of the building. The work contains a technical report, route solutions, a study of the main technological stages, machinery solution, technological regulations, the quality control plan. In the attachment, the time schedule, workforce plan, design of machinery and materials as well as drawings of the construction site equipment.
Parking building in Opava - construction technology project
Bernatík, Lukáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The focus of this thesis is dealing with the elaboration of the construction technology project of the parking house in Opava. The thesis contains a technical report, a time schedule and financial plan and a project for construction site equipment for all construction objects. For the main construction object, a construction technology study of the main technological stages, technological regulations for the assembly of the structural steel construction and fiber-reinforced concrete were prepared. For these topics, inspection and test plans have been devised. The thesis too includes the transportation of machines and materials to the construction site, the plan for securing material resources, occupational safety, and the itemized budget.
Construction-technological stage of the lower construction of an apartment building in Miloslavov
Rumpel, Jonatán ; Vlčková, Jitka Laura (referee) ; Diaz, Yvetta (advisor)
The subject of this bachelor thesis is to elaborate on a construction – technological project of the substructure of an apartment building in Miloslavov, which is located in the newly established part of the village Miloslavov – Alžbetin dvor. The content of the work is the elaboration of an accompanying and summary technical report, broader transport relations, statement of acreage, technological regulations, time schedule, the design of machine set, control and tests plans and safety and health at work.
Solution of the construction-technological phase of the substructure of the fire station building in Brno
Motyčka, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The bachelor's thesis deals with the technological phase of the substructure of the fire station. It is a four-storey building without a basement, which is located on a sloped ground near the Brno dam. The individual floors are designed as receding with dominant terraces on the side of the dam. The building is designed as a reinforced concrete monolithic skeleton with a system of waterproof concrete foundations supplemented by external waterproofing of PVC foil. The building is based on the base plate. The work contains a technical report of the object, a closer and broader situation of transport relations, a detailed statement of acreage, technological regulation for the implementation of the waterproof concrete foundation, drawing and report of construction site equipment, schedule, machine design, control and test plan, safety and health at work, then a variant assessment of construction machinery.
Chemiluminiscenční hodnocení celkové antioxidační kapacity potravin
Vlčková, Jitka ; Polášek, Miroslav (advisor) ; Solich, Petr (referee)
Diplomová práce 2009 Abstract_ENG Jitka Vlčková ABSTRACT An investigation presented was concern to measure and evaluate the total antioxidant capacity (TAC) in samples of red wine clarified with four fining agents (polyvinylpolypyrrolidone and three different types of gelatin). All wine samples were treated by concentrations of 10, 20 and 40 g/hL of finings. The main aim was to discover how the particular agents in different dosages influence the TAC. The second part describes relations between changes in TAC in content of single antioxidant components (total polyphenols, anthocyanins, gallic acid and simple phenols). Total antioxidant capacity in red wine samples was evaluated using the Trolox equivalent antioxidant capacity assay (TEAC). A theoretical part of the thesis briefly summarizes basics about luminescence, focused on chemiluminescent reaction. Theory of free radicals and antioxidants, especially those included in red wine are also described. Process of winemaking aimed at fining is also contained in this part. An experimental part describes techniques of determination of the total antioxidant capacity, principle of chemiluminescent assay based on the luminol/peroxidase system. The results show the different behaviour of gelatin from the polyvinylpolypyrrolidone (PVPP). In general gelatin tends to...
Chemiluminiscenční hodnocení celkové antioxidační kapacity potravin
Vlčková, Jitka ; Polášek, Miroslav (advisor) ; Solich, Petr (referee)
Diplomová práce 2014 Abstract_ENG Jitka Vlčková ABSTRACT An investigation presented was concern to measure and evaluate the total antioxidant capacity (TAC) in samples of red wine clarified with four fining agents (polyvinylpolypyrrolidone and three different types of gelatin). All wine samples were treated by concentrations of 10, 20 and 40 g/hL of finings. The main aim was to discover how the particular agents in different dosages influence the TAC. The second part describes relations between changes in TAC in content of single antioxidant components (total polyphenols, anthocyanins, gallic acid and simple phenols). Total antioxidant capacity in red wine samples was evaluated using the Trolox equivalent antioxidant capacity assay (TEAC). A theoretical part of the thesis briefly summarizes basics about luminescence, focused on chemiluminescent reaction. Theory of free radicals and antioxidants, especially those included in red wine are also described. Process of winemaking aimed at fining is also contained in this part. An experimental part describes techniques of determination of the total antioxidant capacity, principle of chemiluminescent assay based on the luminol/peroxidase system. The results show the different behaviour of gelatin from the polyvinylpolypyrrolidone (PVPP). In general gelatin tends to...
Construction technological project of sports hall construction
Tkáč, Jiří ; Vlčková, Jitka Laura (referee) ; Diaz, Yvetta (advisor)
The thesis deals with Komenského Street sports hall construction in Lysá nad Labem. Although partially dealing with construction of all parts, in detail it studies gym construction, focusing on time management, technology and resources of implementation. The thesis is divided into the drawing and text parts. The former includes site facilities design and building situation. The latter consists of the main part construction project implementation study, itemized budget, time schedule, technological regulations, inspection and testing plan for the implementation of the main construction part 1st floor reinforced concrete columns and walls, construction machines and mechanisms design as well as time and financial schedule.

National Repository of Grey Literature : 145 records found   1 - 10nextend  jump to record:
See also: similar author names
19 VLČKOVÁ, Jana
27 VLČKOVÁ, Jitka
19 Vlčková, Jana
1 Vlčková, Jitka Laura
2 Vlčková, Jovanka
Interested in being notified about new results for this query?
Subscribe to the RSS feed.