Methodical instruction for effectiveness evaluation of destress blasting GM/15/UCIN
Koníček, Petr ; Čížek, P. ; Ptáček, Jiří ; Stoniš, M. ; Przeczek, A.
Rock bursts are one of the most dangerous phenomena occurring in coal mining in the Czech part of the Upper Silesian Coal Basin. In these terms, destress blastings belong to the most important of prevention measures. Seismic effects (as an indicator of stress release) represent the ratio of seismic energy released in the rock mass when blasting to the considered energy of the particular detonated chargé. The methodology is a result of ananalysis of a large data set of destress blastings from rock mass and seismological monitoring data collected over the period 2000 - 2013. A new, respectively verified rating system for evaluation of the effectiveness of destress blastings using the registered seismic energy is the basement of the methodology. The methodology determines to experts of underground hardcoal mining for procedure of effectiveness evaluation of destress blasting operations carried out in the rockburst prevention.
Project monitoring the stress-strain state of the rock mass during extraction of coal seam 30 (634) within the test run mining methods corridor - a pillar in the OPJ Mine CSM - Sever. Proposal verify the possibility to use anti-shake prognosis and prevention using mining methods corridor - pillar within pilot operation in seam 30 (634) in OPJ Mine CSM - Sever
Waclawik, Petr ; Koníček, Petr ; Ptáček, Jiří ; Šňupárek, Richard ; Kajzar, Vlastimil ; Kukutsch, Radovan ; Vavro, Martin ; Souček, Kamil ; Holečko, J. ; Stoniš, M. ; Suchanek, E. ; Sojka, R. ; Przeczek, A.
On the basis of a contract for No. 850/33/10 and Appendix 1 of this contract , between OKD , as, ČSM and the Institute of Geonics AS CR, v.v.i. we present the following project monitoring stress tension-deformation condition of the rock mass during extraction of coal seam No.30 (634 ) within the test run mining methods corridor - pillar in a protective pillars jam CSM Mine, north location. Monitoring of the stress tension-deformation state of rock mass is a prerequisite for successful verification of a new mining method unapproved hall - pillar and its further use in the Czech part of the Upper Silesian Coal Basin. This mining method is designed on the basis of experiences and practices, which are verified in different natural conditions and depths, and therefore it is necessary for the verification of the conditions of the Czech part of the Upper Silesian Basin on the basis of the proposed geotechnical monitoring. Test operation of the new hall - pillar method will be implemented in the seam No.30 (634 ) in the rock mass included in the category without the risk of shocks.
Ochrana zaměstnanců před důlními otřesy v dlouhých důlních dílech a stanovení opatření při zjištění nebezpečných stavů při vedení a provozu důlních děl s cílem zabránit vzniku otřesu. Projekt č. 44-06. Dílčí zpráva o výsledcích řešení etapy č. 5
Konečný, Petr ; Ptáček, Jiří ; Šňupárek, Richard ; Velička, Vilém ; Zeman, Vladislav ; Bonczek, Č. ; Dvorský, P. ; Holečko, J. ; Koníček, P. ; Przeczek, A. ; Stoniš, M.
Řešení projektu se týká ražeb chodeb a úvodních prorážek pro přípravu nových porubních bloků. Snahou je nalézt nové způsoby preventivních opatření, které by v nich omezily na nejmenší možnou míru riziko otřesů. Kromě toho se v projektu řeší problematika zpřesnění lokace seismických jevů a rovněž zkoumá možnost použití vývrtů po trhací práci pro tlakové zavlažování v rámci protiotřesové prevence.
Ochrana zaměstnanců před důlními otřesy v dlouhých důlních dílech a stanovení opatření při zjištění nebezpečných stavů při vedení a provozu důlních děl s cílem zabránit vzniku otřesu. Projekt č. 44-06. Závěrečná zpráva o výsledcích řešení etapy č. 5
Konečný, Petr ; Ptáček, Jiří ; Šňupárek, Richard ; Velička, Vilém ; Zeman, Vladislav ; Bonczek, Č. ; Holečko, J. ; Koníček, P. ; Przeczek, A. ; Stoniš, M.
Řešení projektu se týká ražeb chodeb a úvodních prorážek pro přípravu nových porubních bloků. Snahou je nalézt nové způsoby preventivních opatření, které by v nich omezily na nejmenší možnou míru riziko otřesů. Kromě toho se v projektu řeší problematika zpřesnění lokace seismických jevů a rovněž zkoumá možnost použití vývrtů po trhací práci pro tlakové zavlažování v rámci protiotřesové prevence.