National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Air conditioning in the production hall
Myjavec, Patrik ; Jelínek, Ondřej (referee) ; Blasinski, Petr (advisor)
The bachelor thesis deals with the project of air-conditioning system in the manufacturing hall, storage and administrative premises. Each system is designed to fulfill the operational, functional and sanitary requirements of inner microclimate. System No. 1, for the manufacturing hall, is designed to be able to cover loss of heat in winter time and heat gain in summer time. System No. 2, for storage premises, serves for heat ventilation all year round. System No. 3, for administrative premises, is designed as heat ventilation accompanied by VRV cooling system to cover heat load in summer time. Theoretical part focuses on natural ventilation, its principles and division.
Optimization of ventilation in the production hall
Myjavec, Patrik ; Uher, Pavel (referee) ; Blasinski, Petr (advisor)
Diploma thesis is divided into two parts. The theoretical part deals with natural ventilation and the practical part focuses on the optimization of the ventilation in the original hall using CFD simulation. One of the solutions is proposed in the design part of the diploma thesis.
Optimization of ventilation in the production hall
Myjavec, Patrik ; Uher, Pavel (referee) ; Blasinski, Petr (advisor)
Diploma thesis is divided into two parts. The theoretical part deals with natural ventilation and the practical part focuses on the optimization of the ventilation in the original hall using CFD simulation. One of the solutions is proposed in the design part of the diploma thesis.
Air conditioning in the production hall
Myjavec, Patrik ; Jelínek, Ondřej (referee) ; Blasinski, Petr (advisor)
The bachelor thesis deals with the project of air-conditioning system in the manufacturing hall, storage and administrative premises. Each system is designed to fulfill the operational, functional and sanitary requirements of inner microclimate. System No. 1, for the manufacturing hall, is designed to be able to cover loss of heat in winter time and heat gain in summer time. System No. 2, for storage premises, serves for heat ventilation all year round. System No. 3, for administrative premises, is designed as heat ventilation accompanied by VRV cooling system to cover heat load in summer time. Theoretical part focuses on natural ventilation, its principles and division.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.