National Repository of Grey Literature 78 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Implementation of Superstructure of Apartment Building in Havirov
Kolmačka, Ondřej ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
This bachelor's thesis deals with the elaboration of a technological project for the stage of rough superstructure of an apartment building in Havířov. The vertical construction system of the apartment building is made of sand-lime blocks. The horizontal construction system consists of monolithic reinforced concrete structures. The content of this bachelor's thesis is the elaboration of a technical report on a construction technology project, the situation of construction with closer transport relationships, construction supply design, item budget for selected technological processes, technological regulation for vertical structures - masonry, construction organization for a given technological stage, including equipment drawing. construction site, time schedule for the technological stage, balance of resources, technological analysis, design of machinery for the technological stage, quality requirements and their provision in the implementation of vertical load-bearing structures – masonry and occupational safety of the solved technological stage. Furthermore, the calculation of the construction according to technical and economic indicators, the accompanying and summary technical report and diagrams.
Implementation of Apartment House in Brno - Building Contruction Project
Pospíšil, Dominik ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
Construction Project for Station of Fire and Rescue Services in Jaroměř
Nývlt, Josef ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The objective of this diploma thesis is the processing of the construction technology design as a part of the preparation and implementation of the fire station in Jaroměř. It is a new construction of the main building, which is supplemented by other objects and engineering buildings. The thesis deals with complex design of the implementation of the construction and then focuses in more detail on the installation of the supporting frame structure, which consists of reinforced concrete prefabricated elements. The whole project also includes a technical report on the construction technology project, a study of the implementation of the main technological stages of the main building, solutions for transport routes for construction supply, construction site design, machine set design, technological regulations with assembly diagrams, control and test plan, time plans and balance of resource needs, itemized budget and occupational safety and health plan. The diploma thesis is supplemented by a specialized part dealing with the reconstruction of the area road with a bituminous cover and the implementation of other paved areas within the area of the fire station.
Construction-technological project of administrative building Dukelská
Lidmila, Jan ; Liška, Pavel (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is a construction technology project for an office building Dukelská in Brno. The content of the work is a technical report to the construction technology project, design of transport solutions, time and financial evaluation of the construction, project for a construction site equipment, design of a machine assemblies. For the selected construction phase a technological specification and check and test plan is designed. The work also deals with environmental and safety risks, draft contract for work and alternative technologies of vertical structures.
Construction Project for Implementation of Industrial Hall for Automotive Industry
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
Underground Parking in Bratislava - Building Contruction Project
Raučinová, Veronika ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The topic of the diploma thesis is the elaboration of a construction-technological project for the Underground Parking for the Pradiareň BCT in Bratislava. The work contains a technical report for a construction technology project, a study of the implementation of the main technological stages of the building, solving broader transport relations with the design of the building supply, object time and financial plan, time plan, construction site project, design of main machines, technological regulation for monolithic construction , the balance of workers and main machines, control and test plans for the operation of the monolithic structure and the health and safety plan. As another assignment, I process the item budget of selected technological processes, schematic solution of pilots, selected LEED certification points, noise study, access road technology, scheme of connection of object SO 0.2 to object BCT1 and formwork drawings.
Construction technology project of extension of the Supreme Court building in Brno
Coník, Šimon ; Venkrbec, Václav (referee) ; Liška, Pavel (advisor)
Theme of the diploma thesis is a construction technology project extension of the building of the Supreme Court of the Czech Republic in Brno. The content of the diploma thesis is the study of the main technological stages of the main building, solution of wider transport relations with a focus on building supply, objects schedule, time schedule of the main building. The work also includes the project of construction site equipment, design of the main construction machines and mechanisms, technological regulations for special foundations and rough construction, which are supplemented by control and test plans and a plan for securing material resources. As part of other assignments, As part of other assignments, I process occupational health and safety, ecology and environmental protection for selected construction processes, itemized budget for special foundation and rough construction
Implementation of Apartment House for Social Housing in Starec - Building Contruction Project
Bobek, Vojtěch ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
Master thesis focuses on complex conducting of the technological project with accented earthwork, laying foundations and ceiling construction. Apartment building consists of two floors and is based in complicated geotechnical conditions which require changing subsoil and laying a foundation slab. The main aim of this thesis is a proposal of technological notes, time and financial management, selection of machinery, transport to the building site, work safety regulations, quality check of the conducted work and construction organisation.
Construction-technological stage of the foundation of a multifunctional house in Řečkovice
Hrabovský, Lukáš ; Liška, Pavel (referee) ; Diaz, Yvetta (advisor)
The subject of this bachelor's thesis is the elaboration of a construction technology project for the foundation of a multifunctional house in Řečkovice. The building is located in the built-up area of the Brno-Řečkovice district. The multifunctional house is based on piles and a foundation slab. The content of the work is the elaboration of an accompanying and technical report, technological regulations, design of machinery, control and test plans, time schedule, wider transport relations, solution of construction site equipment, safety and health at work, itemized budget, including statement of acreage.
Implementation of Superstructure of Forest's Administration Building in Hlubočky
Barák, Libor ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The goal of bachelor's thesis Implementation of Superstructure of Forest's Administration Building in Hlubočky is the solution of selected parts of a construction technology project for the rough superstructure of Forest's Administration Building Hlubočky area in Mrsklesy village. This thesis deals with the engineering report for the construction technology project, block plan with transport route and transport routes, the itemized budget of the selected technology processes, technological regulation for horizontal structurals, the organization of development for the technological phase including the concept of drawing the site facilities, schedule for technological phase, balance of resources and technological analysis, concept of mechanical assembly, control plan and test plan for horizontal structurals and Occupational safety and health for this technological phase. In this bachelor's thesis, there are also estimated development costs for the whole Forest's Administration Building. In the construction calculation technological-economic indicators were used for the estimates.

National Repository of Grey Literature : 78 records found   1 - 10nextend  jump to record:
See also: similar author names
4 LIŠKA, Pavel
14 LIŠKA, Petr
14 Liška, Petr
14 Líska, Petr
Interested in being notified about new results for this query?
Subscribe to the RSS feed.