National Repository of Grey Literature 197 records found  previous11 - 20nextend  jump to record: Search took 0.01 seconds. 
Residential house in Čáslav, gross superstructure
Němec, Lukáš ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This thesis investigates the solution of selected technological project of the construction of gross superstructure residential building in the former barracks Prokopa Holeho. Their work includes the technical report solved object, technological specification, bill of quantities, schedule and budget, addressing broader transport relations, organization development, design of mechanical assemblies, including drawings and technical news site facilities, safety, environmental protection, inspection and test plans.
Realization of roofing the residental building L - Garden II in Hostivice
Vožeh, Jan ; Valenta, Michal (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis covers the technological steps of the ground object roofing. It consists of two technological sequence of operations, calculation, schedule, resources balance and proposal for machines.
Production Hall with an Administrative Part in Lanškroun, Planning and Implementation of the Construction
Zajíček, Miroslav ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The subject of the thesis is the construction technological planning and implementation of a production hall construction with an administrative part in Lanškroun. The thesis contains a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written.
Central control rail traffic management Prague - preparation for the implementation and management of buildings
Buček, Radek ; Řihák, Pavel (referee) ; Šlanhof, Jiří (advisor)
The thesis deals with the preparation of the implementation and management of building central dispatching of rail traffic management Prague. The thesis contains the selected part of building technological project together with appropriate drawings. The project addresses mainly the rough construction of the mainbuilding.The aim of this thesis is to design appropriate and effective way of realization of construction depending on local conditions.
Apartment House Kasárny E in Uherské Hradiště, Gross Upper Structure
Beníček, Matěj ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The subject of this bachelor thesis is the technological solution of the implementation of the rough upper constructions of the apartment building in Uherské Hradiště. Content pages related to business travel, technology regulations for carrying vertical load-bearing and non-load-bearing walls, machinery design, site equipment solutions, site safety and health protection concepts and inspection and test plan for masonry construction.
Sports Centre in Pardubice, Preparation for Construction
Sikelová, Tereza ; Průcha, Aleš (referee) ; Šlanhof, Jiří (advisor)
The aim of this master's thesis is the elaboration of a preparation of construction implementation of the Sport Center in Pardubice. The construction system of the building is wall-mounted, made of Porotherm blocks. Ceiling structures are made from prefabricated panels. This thesis covers the study of rough construction implementation, the technological regulations and control and testing plan for the implementation of green roof and ventilated facade, construction site equipment, mechanization design, safety aspects, noise study, and comparison of green roofs. Furthermore, the thesis includes the time and financial plan for the construction of the main building structure. The work encompasses a drawing section.
The Extension of the Business Incubator - South, Rough Superstructure
Sankot, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The topic of thic bachelor thesis is processing of a technological solution of the rough top construction of the Business Incubator in Brno. It is a new four-storey, non-cellular building for administrative and office activities. The subject of this thesis is processing of a technological regulation for the prefabricated reinforced concrete skeleton. The next parts of the thesis, focused on the phase of the rough top construction, are: technical report, situation with wider relations of the transport routes, plan of the construction organization with the drawing of the building site facilities (equipment), itemized budget with the statement of acreages, schedule of work, inspection and test schedule, design of the mechanical (machine) assembly and the safety of work of the (solved) technological phase.
New construction of block of apartments A1, at Slavkov u Brna - Preparation of the realization construction
Stuchlík, Jaroslav ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This Thesis deals with the organization of realization of the residential building A1 Slavkov u Brna. Thesis solves mainly technological process of realization of the main object. The thesis aims to develop a time schedule of execution, usage of mechanisms timetable, material resources, technological regulations, inspection and test plans. The annex also solved graphically construction site facility set up and its modifications during execution depending on different type of works. This Thesis is based on realization project provided by the realization company and with consent of project designer.
Annes, Extension and Building Adjustment of the Building House Neumannova in Brno, Preparation and Realization of Buildings
Martincová, Michaela ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The thesis deals with the technological stage of the rough construction of the annex and the reconstruction of the apartment building on Neumannova Street in Brno-Pisárky. These are earthworks, rough substructure, rough construction, demolition work, and some of the finishing work. The diploma thesis deals with the design of the work process of the works, the design of the machine assemblies, the studies of the implementation of the main technological stages, the preparation of the budget item, the time schedule, the time and the financial plan of the object, the control and testing plan, the material assurance plan and the transport relations. Further, the design of the building facility is processed and a technical report of the building facility is made.
Central hospital buildings in Uherske Hradiste - Building construction technology preparation
Novotný, Zdeněk ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This diploma thesis deals with construction and technological preparation of the construction of the central hospital building in the town Uherske Hradiste. The work is composed of selected parts of the building and technological project, which is annexed to the diploma thesis. On some selected parts of the building and technological project is also prepared relevant drawings. The aim of the thesis is to choose a suitable and effective implementation process object depending on the circumstances and determine the resources of time, funds, personnel and materials.

National Repository of Grey Literature : 197 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.